Новости МКС

Автор ДмитрийК, 22.12.2005 10:58:03

« назад - далее »

0 Пользователи и 3 гостей просматривают эту тему.

tnt22

Цитировать Jonathan McDowell‏Подлинная учетная запись @planet4589 31 сек. назад

Whitson removed the fabric cover on the PMA-3 docking unit at 1230 UTC; Kimbrough has replaced the MDM-16E computer S/N 0103 with a new one

tnt22

Цитировать William Harwood‏ @cbs_spacenews 54 сек. назад

EVA41: Kimbrough and Whitson are running ahead of schedule completing their initial tasks

tnt22

Цитировать William Harwood‏ @cbs_spacenews 2 мин. назад

EVA41: After a bit of difficulty, Kimbrough has replaced a computer relay box with an upgraded, more powerful unit...

William Harwood‏ @cbs_spacenews 2 мин. назад

EVA41: ...while Whitson connected heater cables to the PMA-3 docking port extension and folded back a thermal cover

tnt22

Цитировать Chris B - NSF‏ @NASASpaceflight 25 сек. назад

PMA-3 Thermal Cover. It's like dealing with bedsheets in zero G.


tnt22

Цитировать ISS Updates‏ @ISS101 3 мин назад

.@astro_kimbrough successfully bolted the new EXT-1 MDM into place and connected an Ethernet cable. Mission Control now powering up the MDM.

tnt22

Цитировать ISS Updates‏ @ISS101 25 сек назад

.@AstroPeggy still working with the PMA cover, will get some help from @astro_kimbrough to get it packed away.

tnt22

Цитировать Jonathan McDowell‏Подлинная учетная запись @planet4589 3 мин. назад

It took both Whitson and Kimbrough working together to stuff the PMA-3 cover into the cover bag for return to the airlock.

tnt22

Цитировать ISS Updates‏ @ISS101 2 мин назад

PMA-3 cover is tightly packed and ready for its return to the airlock.



Thomas Pesquet‏Подлинная учетная запись @Thom_astro 4 мин. назад

Shane getting the equipment ready for airlock egress #spacewalk @astro_kimbrough qui prépare les équipements avant de sortir du sas

tnt22

Цитировать ISS Updates‏ @ISS101 4 мин назад

Both spacewalkers are back at the airlock, dropping off bags from the first tasks & picking up equipment for Node 3.

tnt22

Цитировать William Harwood‏ @cbs_spacenews 1 мин. назад

EVA41: Kimbrough has replaced a computer relay box with an upgraded, more powerful unit...

William Harwood‏ @cbs_spacenews 56 сек. назад

EVA41: ...while Whitson connected heater cables to the PMA-3 docking port extension and folded by a thermal cover with Kimbrough's help

tnt22

Цитировать William Harwood‏ @cbs_spacenews 2 мин. назад

EVA41: Both astronauts will now turn to installing axial shields over Tranquility's outboard port

tnt22

Цитировать ISS Updates‏ @ISS101 1 мин назад

PET+2 Hours. Currently preparing the Node 3 Axial Shields for transfer & installation on the N3 Port CBM. http://spaceflight101.com/iss-expedition-50/live-spacewalk-coverage/ ...

tnt22

Цитировать ISS Updates‏ @ISS101 35 сек назад

Canadarm2 is serving as the Station's robotic camera man today, providing views of work at the Node 3 CBM.

tnt22


tnt22

Цитировать Chris B - NSF‏ @NASASpaceflight 2 мин. назад

Meanwhile, in space right this second!

tnt22

Цитировать ISS Updates‏ @ISS101 3 мин назад

One of the four Node 3 axial shields floats away from the worksite after becoming untethered.

tnt22

Цитировать Jonathan McDowell‏Подлинная учетная запись @planet4589 11 мин. назад

Node 3 axial shield 2 installed at about 1406 UTC. Axial shield 1 came loose, has floated off into space (~ 1400 UTC) Will reenter in days

Chris B - NSF‏ @NASASpaceflight 10 мин. назад

Whoops. An axial shield has decided to escape from the EVA and has floated off.


tnt22

Цитировать Jonathan McDowell‏Подлинная учетная запись @planet4589 14 мин. назад

The Node 3 axial shield is made of fabric, so is hard to track with radars, but probably big enough that it will get cataloged as 1998-067LF

tnt22

Цитировать ISS Updates‏ @ISS101 8 мин. назад

Mission Control successfully checked out the PMA-3 heater power and telemetry connections @AstroPeggy put in place earlier during the EVA.

tnt22