GOES-S - Atlas V 541 (AV-079) - Canaveral SLC-41 - 02.03.2018

Автор tnt22, 06.12.2017 02:01:13

« назад - далее »

0 Пользователи и 1 гость просматривают эту тему.

tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 34 мин. назад

Transfer Orbit Injection was nominal, Centaur's navigation platform is showing the stack in an orbit of 204 x 32,780 Kilometers, inclined 25.7°. While coasting, the vehicle will pass over Africa&Madagascar before crossing the Indian Ocean. Burn #3 occurs over the Java Sea. #GOESS

tnt22

#121
ЦитироватьJonathan McDowell‏Подлинная учетная запись @planet4589 5 мин. назад

Atlas AV-077 was launched from Cape Canaveral at 2202 UTC carrying NOAA's GOES-S geostationary weather satellite. Currently in initial geotransfer orbit, will make another Centaur burn at 0030 UTC to raise orbit closer to GEO.
P.S.
ЦитироватьJonathan McDowell‏Подлинная учетная запись @planet4589 33 мин. назад

Correction: third Centaur burn is at 0130 UTC (2030 EST), not 0030 UTC.

tnt22

Пуск. Съёмка с различных точек полигона.

tnt22

ЦитироватьGOES-S launched by Atlas V 541

 SciNews

Опубликовано: 1 мар. 2018 г.
(4:44)

tnt22

ЦитироватьLaunch of Atlas V 541 Rocket with GOES-S Weather Satellite

 Space Videos

Опубликовано: 1 мар. 2018 г.
 (13:22)

tnt22


tnt22

Трансляция НАСА возобновится в 01:15 UTC

tnt22

https://blogs.nasa.gov/goes/2018/03/01/centaur-stage-in-coast-phase/
ЦитироватьThe Centaur stage of a United Launch Alliance Atlas V rocket is firing its small thrusters to position itself and the GOES-S payload into the proper position to fire its main engine for the final time during the mission.  NASA TV will resume coverage at 8:15 p.m. EST. Spacecraft separation is set to occur at approximately 8:31:55 p.m.

tnt22

ЦитироватьNASA's GOES-S Ready for Launch Atop Atlas V

 NASAKennedy

Опубликовано: 1 мар. 2018 г.
 (2:09)

tnt22

ЦитироватьGOES-S, Atlas V are "Go" for Launch

 NASAKennedy

Опубликовано: 1 мар. 2018 г.

In the launch control at Cape Canaveral Air Force Station, NASA and contractor managers and engineers monitor progress in the countdown to launch NOAA's Geostationary Operational Environmental Satellite, or GOES-S. The poll confirms all is ready for liftoff. The GOES series of satellites will significantly improve the detection and observation of environmental phenomena that directly affect public safety, protection of property and the nation's economic health and prosperity. GOES-S is scheduled to lift off at 5:02 p.m. EST on March 1, 2018.
 (1:01)

tnt22

ЦитироватьLiftoff of GOES-S

 NASAKennedy

Опубликовано: 1 мар. 2018 г.
 (2:03)

tnt22

ЦитироватьSpaceflight Now‏ @SpaceflightNow 30 мин. назад

Here's another view of today's Atlas 5 launch as captured from a tracking camera near the launch pad at Cape Canaveral.

(video 0:33)

tnt22


tnt22

ЦитироватьNASA_LSP‏Подлинная учетная запись @NASA_LSP 9 мин. назад

Over 2 weeks, @NOAASatellites #GOESS 's main engine will take it from this transfer orbit of 8200 x 35300 km to a geosynchronous orbit. The perigee at #AtlasV insertion is slightly and inclination slightly than #GOESR GTO insertion. Tricky question: 13% votes

tnt22


tnt22

ЦитироватьNASA_LSP‏Подлинная учетная запись @NASA_LSP 4 мин. назад

Out of plane rocket burns change the inclination of the orbit. #AtlasV will lower #GOESS to 9.52 deg. (57% voted ) The spacecraft engines will take it down to 0 deg inclination while also raising the apogee and perigee to geostationary orbit.

tnt22

ЦитироватьJohn Kraus‏ @johnkrausphotos 1 ч. назад

The RD-180 engine and four @AerojetRdyne AJ-60A solid rocket motors power @ulalaunch's Atlas V and #GOESS to space on behalf of #NASA and #NOAA.

tnt22

ЦитироватьNOAA Satellites‏Подлинная учетная запись @NOAASatellites 4 мин. назад

#GOESS the night's not over yet. We're still waiting for spacecraft separation and solar array deployment, bringing power to the satellite. Updates starting NOW on http://nasa.gov/live  (photo credit: ULA)

tnt22


tnt22