GSAT-6A - GSLV-F08 (Mk-II) - Шрихарикота - 29.03.2018, 11:26 UTC

Автор tnt22, 11.07.2017 22:54:56

« назад - далее »

0 Пользователи и 1 гость просматривают эту тему.

tnt22


tnt22


tnt22


tnt22


tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 14 сек. назад

L-20 Minutes: Final flight control reconfigurations wrap up at this point in the countdown and GSAT-6A should be in the process of readying for liftoff by switching to internal power. Tracking Stations have reported launch readiness. http://bit.ly/2GaUIiY  #GSLV

tnt22


tnt22


tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 1 мин. назад

#GSLV Flight Profile: http://bit.ly/2DVYEhC  S139 fires for under two minutes & will separate along with the boosters at T+2:31, followed by a 2 min & 15 sec burn of GS2. The Cryo Stage fires up at T+4:46 and burns for 12 min & 45 sec to push the satellite into a standard GTO.

tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 57 сек. назад

#GSLV is now entering its choreographed countdown sequence to switch to battery power, enable igniters, pressurize its tanks and transition its flight controls to launch mode.

tnt22


tnt22


tnt22


tnt22


tnt22


tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 20 сек. назад

Ten minutes are left on the Cryogenic Upper Stage. Flight trajectory so far appears right on the money. #GSLV

tnt22


tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 2 мин. назад

T+10 Minutes: #GSLV is targeting an orbit of 170 by 35,975 Kilometers at an inclination of 20.63 degrees. This orbit will enable GSAT-6A to reach a stationary position in GEO with delta-v of 1,656 m/s.

tnt22

ЦитироватьSpaceflight101 LIVE‏ @S101_Live 2 мин.назад

Five minutes to go in this first and only burn of the Cryogenic Upper Stage. Trajectory is tracking down the nominal. #GSLV

tnt22


tnt22