NROL-79: Intruder 12A & 12B - Atlas V 401 (AV-068) - Ванденберг SLC-3E - 01.03.2017, 17:50 UTC

Автор Salo, 20.10.2016 00:50:21

« назад - далее »

0 Пользователи и 1 гость просматривают эту тему.

Безумный Шляпник

Цитироватьтавот пишет:
В этот раз как, без пассажиров ?
По крайней мере, дополнительные ПН не объявлялись.
Ступень топится в Тихом океане, западнее Патагонии.

tnt22

Цитировать03/01 16:30
The 8-million-pound mobile service tower has been retracted from around the Atlas 5 rocket, revealing the 19-story-tall vehicle for liftoff at exactly 9:49:51 a.m. local time today.
The ground crews are getting the gantry's doors closed, plus finishing the final buttoning up of pad equipment before all workers clear the pad for the remainder of the countdown.

tnt22

Цитировать03/01 16:50
The gantry has been secured in its launch position with the doors closed.

tnt22


tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 5 мин. назад

Identification of NROL-79 as NOSS was possible given the mission's launch site, vehicle and unique ascent path into a characteristic orbit.

Spaceflight101 LIVE‏ @S101_Live 8 мин. назад

The first two NOSS generations flew in triplet formation to triangulate a ship's position, the 3rd generation uses pairs of satellites.

Spaceflight101 LIVE‏ @S101_Live 10 мин. назад

Introduced in 1976, NOSS is used to track the position of foreign ships and aircraft through their radio signals.

Spaceflight101 LIVE‏ @S101_Live 18 мин. назад

NROL-79 is the eighth mission in support of the third generation of the Naval Ocean Surveillance Satellite Program. http://bit.ly/2lSNdSo

tnt22

#45
Identifying the classified NROL-79 Satellite
http://spaceflight101.com/atlas-v-nrol-79/nrol-79-satellite/
Цитировать...
The newer satellites entered orbits around 1,000 by 1,200km, 63.4° to avoid a phenomenon discovered during the initial operations of NOSS – a gradual increase in orbital eccentricity due to perturbations caused by Earth's gravitational field. The new setup, as detailed by satellite tracker Ted Molczan, launches the satellites into an orbit with an argument of perigee near 180 degrees. The argument of perigee shifts gradually to 90 degrees and with that, the orbit becomes circular at 1,100 Kilometers around four years after launch. The orbital precession then continues and the orbit becomes elliptical again, reaching 1,000 by 1,200 km again after eight years, likely the operational life of the satellites.
...

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 1 мин. назад
 
Atlas V entered countdown operations eight hours prior to the opening of the launch window, starting with vehicle power-up. #NROL79

tnt22

Цитировать03/01 17:34
Workers are leaving the pad area in advance of today's propellant loading and launch of the Atlas 5 rocket.

03/01 17:31
In the pre-fueling weather update, conditions remain ideal at Vandenberg for a rocket launch this morning. Skies are clear, winds are light and visibility is good. Air Force meteorologists give a 100 percent chance of favorable weather at the 9:49:51 a.m. launch time (12:49:51 p.m. EST; 1749:51 GMT).

tnt22

Atlas Countdown Timeline
http://spaceflight101.com/atlas-countdown-timeline/
Спойлер
Цитировать
Atlas Countdown Timeline
[TH]T-[/TH] [TH]L-[/TH] [TH]Event[/TH]

12:00Countdown Begins

12:00MLP Clear of non essential personnel

12:00Launch Pad Environmental Control System Preps

12:00Nitrogen Purge

12:00Weather Briefing

12:00Search Light Power Up

12:00SLC41 warning lights on

08:30Atlas System Start in preparation for Tanking

08:30Instrument Checks

08:30Lox System Preparations

08:30Gas Detection System Preparations

08:30Internal Battery Checks

08:30LH2 System Preparations

07:05Set Roadblocks

07:00Atlas V Power-Up

05:25Weather Briefing

05:15Communication Checks

05:15C-Band Communication Checks

04:50Weather Balloon Release

04:20S-Band Communication Checks

04:00L-4HR Commanding

04:00Polls

03:35Initiation of Nitrogen Flow

03:34Set Spacecraft Clock

03:00SLC Clear of all Personnel
02:0003:00Launch Conductor Briefing on Vehicle Conditions
HOLDING02:40GO/No GO for Tanking Poll
30min Hold02:33Pre-Test Tanking Briefing
02:0002:30Centaur LOX Tank Chilldown
COUNTING02:30Atlas LOX Vault & MLP Chilldown

02:30Centaur Helium Storage Bottle Pressurization

02:30Atlas Pressure Vessels Charge

02:30Atlas V RP-1 Fuel Tank Press
01:5502:25Safe Arm Device Cycle Test
01:5002:20Centaur LOX Transfer Line Chilldown
01:4502:15Launch Hazard Area in Effect
01:4302:13Centaur LOX Tanking begins
01:4002:10Weather Balloon Release
01:3302:03Centaur LH2 Tank Press to Chilldown Level
01:3002:00Atlas V LOX Tanking begins
01:2501:55Centaur LOX at 75%
01:2501:55Centaur LH2 Transfer Lines Chilldown
01:2001:50Centaur LH2 Loading
01:0001:30Centaur Engine Chilldown
00:5501:25Flight Control Final Preparations for Hydraulic Press
00:4501:15Main Engine Pneumatic System Press to Flight Level
00:4001:10Heater Activation
00:4001:10FTS Test
00:3501:05FGM Activation
00:2500:55Load Boost Block
00:2000:50Fault Protection Validation
00:1700:27Polls for Terminal Countdown
00:1600:46Fuel Fill Sequence Initiation
00:1500:45History Data Dump
00:1500:45Term CT Configuration complete
00:0400:34T-4-Minute HOLD
HOLDING00:30Weather Briefing
Variable Hold00:25Fuel Fill Sequence Complete

00:17Range Clear Poll

00:16Spacecraft GO/No GO Poll

00:16NAM Poll

00:16SMD Poll

00:15Water Deluge System actuation Pressure Adjustment

00:15Centaur LOX at Flight Level

00:15Centaur LH2 at Flight Level

00:13Spacecraft Poll

00:07Launch Director Final Poll

>>>>SAFE L-9MIN CONFIGURATION FOR EXTENDED HOLDS

00:07Spacecraft Status Check

00:06Spacecraft on internal Power

00:06LD GO to Launch

00:05Range Clear Validation
COUNTING00:04Hazardous Gas Monitoring Complete
00:0400:04Automatic Sequence Begins
00:0400:04Atlas LOX Replenish Terminated
00:0400:04Atlas LOX Tank Pressurization
00:0300:03Atlas Tanks at Flight Pressure
00:0200:02Atlas and Centaur switch to internal Power
00:01:5500:01:55CMD Sequence
00:01:5000:01:50Centaur Topping Sequence complete
00:01:3000:01:30Launch Control System Enabled
00:00:1600:00:16Launch Verification
00:00:02.700:00:02.7Main Engine Start
00:00:00.000:00:00.0Booster Ignition
+00:00:01.1+00:00:01.1Liftoff
[свернуть]

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 2 мин. назад
 
This half-hour hold is dedicated to final tanking preparations, the pre-task briefing and the Go/No Go Poll by the launch team. #NROL79
 
  Spaceflight101 LIVE‏ @S101_Live 3 мин. назад

T-2 Hours & HOLDING (L-3:00) - This is the first of two built-in holds in today's countdown to allow teams to deal with open tasks. #NROL79

tnt22

Дали добро на заправку криогенными компонентами
Цитировать ULA‏Подлинная учетная запись @ulalaunch 2 мин. назад
 
The team has given the GO to begin cryogenic fueling. On track for #AtlasV #NROL79 launch at 9:50amPST. @NatReconOfc @30thSpaceWing
 

tnt22

Начали наддув бака керосина
Цитировать Spaceflight101 LIVE‏ @S101_Live 2 мин. назад
 
The fuel tank of the Common Core Booster, loaded with Kerosene earlier, is pressurized to Step 2 pressure at the start of tanking ops.

tnt22

Полтора часа заправки...
Цитировать Spaceflight101 LIVE‏ @S101_Live 6 мин назад

T-2 Hours & COUNTING! Clocks have resumed, Atlas V now entering tanking operations, a 90-minute process. #NROL79 http://bit.ly/1j3Sqm0

tnt22

Гелий...
Цитировать Spaceflight101 LIVE‏ @S101_Live 3 мин. назад
 
Pressurization & filling of the helium bottles aboard the Common Core Booster & Centaur is beginning at this time.

tnt22

Начали заправку Центавра жидким водородом...
Цитировать Spaceflight101 LIVE‏ @S101_Live 4 мин. назад
 
Liquid Hydrogen flow to Centaur has been initiated. The upper stage is loaded with 48,000 liters of the -253°C fuel.

tnt22


tnt22

Цитировать03/01 19:49  L-60 minutes and counting
The 720,000-pound Atlas 5 rocket now stands fueled for flight and activities are proceeding toward a liftoff at 9:49:51 a.m. local time (12:49:51 p.m. EST; 1749:51 GMT).

tnt22


tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 41 сек. назад
 
As part of final setups inside L-1, Atlas V receives the appropriate flight software & the fault detection system is configured for flight.

tnt22

Цитировать03/01 20:17
Liquid oxygen and liquid hydrogen tanks are at flight level.