GaganYaan (беспилотный орбитальный) – HLVM3-G1 – Шрихарикота SLP – 2nd Quarter 2025

Автор zandr, 13.12.2024 21:40:29

« назад - далее »

0 Пользователи и 1 гость просматривают эту тему.

zandr

https://nextspaceflight.com/launches/details/1980
ЦитироватьGaganYaan Demo Flight 1
Launch Time
NET February, 2025
First orbital flight of the GaganYaan spacecraft. First flight of the GSLV Mark III with an escape tower.

Rocket  LVM-3
...
Mission Details
GaganYaan Demo Flight 1
An uncrewed orbital test flight of ISRO's human-rated GaganYaan capsule.
Payloads: 1    Low Earth Orbit

Location
Second Launch Pad, Satish Dhawan Space Centre, India

zandr

https://x.com/isro/status/1867517491628708166
ЦитироватьISRO  @isro
A significant milestone for the Gaganyaan Program! The first solid motor segment has been moved from the production plant to the launch complex, marking a key step towards the HLVM3 G1 flight. India's human spaceflight dreams are taking shape!
ТТУ перевезли на СК.

zandr

Цитата: zandr от 05.02.2024 21:14:31https://tass.ru/kosmos/19896993
ЦитироватьИндия в III квартале 2024 года отправит в космос человекоподобного робота
НЬЮ-ДЕЛИ, 4 февраля. /ТАСС/. Индия намерена отправить на орбиту человекоподобного робота по имени Vyommitra в III квартале 2024 года. Как сообщил журналистам госминистр Джитендра Сингх, курирующий в индийском правительстве атомную и космическую отрасли. Робот проверит работу систем жизнеобеспечения космического корабля "Гаганьян", прежде чем на орбиту смогут отправиться люди.
"Беспилотная миссия Vyommitra запланирована на III квартал этого года", - приводит слова госминистра пресс-служба правительства Индии в распространенном пресс-релизе.
Имя робота образовано от двух санскритских слов - "вйом" ("пространство", "космос") и "митра" ("друг"). Он имеет образ женщины, знает несколько языков и может отвечать на вопросы, в том числе касающиеся технического состояния корабля.
"Астронавт Vyommitra спроектирован таким образом, чтобы имитировать человеческие функции в космической среде и взаимодействовать с системами жизнеобеспечения", - отметил госминистр. Робот, по его словам, может контролировать параметры орбитального модуля, управлять шестью панелями корабля, отвечать на вопросы центра управления полетом. Это главная проверка перед полетом первого национального космического экипажа.
Спойлер
Как сообщил ранее в воскресенье глава Индийской организации космических исследований (ISRO) Шридхара Паникер Сомнатх, планируется, что республика отправит на орбиту первый космический корабль с экипажем на борту к концу 2025 года.

Сначала робот
В августе 2018 года индийский премьер-министр Нарендра Моди объявил, что "сын или дочь Индии отправится в космос с национальным индийским флагом в руках к 2022 году", когда страна будет отмечать 75 лет освобождения от британского колониального господства. Название проекта "Гаганьян" (от санскритского "гагана" - небеса) означает "небесный корабль". Однако из-за пандемии COVID-19, остановившей в марте 2020 года работы по этому проекту, отправка на орбиту миссии "Гаганьян" была отложена.
В том же 2018 году занимавший в то время пост главы ISRO Кайласавадиву Сиван сообщил, что у организации нет планов отправлять на орбиту какое-либо животное для испытаний. От отметил, что различные мировые космические организации обычно сначала использовали животных для проверки системы жизнеобеспечения корабля, но Индия решила отказаться от такой практики, поскольку это "противоречит идеологии индуизма, которая осуждает причинение вреда животным".
Вместо этого в Индии решили отправить на орбиту специально созданного антропоморфного робота, на котором будут испытаны все необходимые системы. Только после этого будет запущен экипаж из людей.
Первоначально планировалось, что в составе экипажа будет женщина. Но в число кандидатов в члены первой индийской пилотируемой космической миссии пока были отобраны только мужчины - четыре человека. Их имена еще не сообщаются, известно лишь, что все они - бывшие летчики ВВС. Они прошли подготовку в России - в Центре подготовки космонавтов им. Ю. А. Гагарина в Звездном городке. Возможно, поэтому индийское космическое ведомство решило придать человекообразному роботу, который первым отправится в космос, женские черты.
[свернуть]

Astro Cat

Цитата: zandr от 13.12.2024 23:00:13в III квартале 2024 года

Вот-вот. Постоянные сдвиги вправо у индусов. Я уж сомневаюсь, что они вообще куда полетят.

Rocinante

https://www.news18.com/india/gaganyaans-unmanned-mission-may-go-to-space-next-march-isro-ships-to-track-from-pacific-atlantic-oceans-9132834.html

ЦитироватьCNN-News18 accessed documents with details of Gaganyaan's first unmanned mission. "ISRO (Indian Space Research Organization) under Government of India is scheduling a scientific experiment tentatively during the period between March 1, 2025 and August 31, 2025. Tentative schedule of mission is slated as March 1, 2025," the documents state referring to 'Gaganyaan G1 Mission', described as an unmanned mission from Sriharikota

G1 планируют пустить в период с 1 марта по 31 августа 2025
Кнопка "ВКЛ." просто давала сигнал к запуску с Марса. Кнопка "ВЫКЛ." вообще ни к чему не была подсоединена. Ее поставили на пульте по настоянию марсианских психологов, которые утверждали, что человек всегда чувствует себя спокойнее, имея дело с машинами, которые можно выключить

zandr

https://www.isro.gov.in/LVM3_first_uncrewed_flight_Gaganyaan.html
ЦитироватьGaganyaan-G1 Launch campaign commences: Human Rated LVM3 assembly starts at SDSC for the first un-crewed flight
December 18, 2024
It was on December 18. 2014, that the Indian Coast Guard recovered the Crew Module from the turbulent seas of Bay of Bengal, approximately 1600 km from SDSC-SHAR. On the morning of the same day, LVM3-X in its maiden flight had lifted a Crew Module of mass of 3775 kg (LVM3-X/CARE mission) into a suborbital altitude of 126 km from where it was controlled using thrusters to orient it for a favourable re-entry. The Crew Module descended using parachutes to have a smooth splash down at the designated location. The Crew Module was developed as part of pre-project activities of Human Spaceflight Project, well before the official Gaganyaan project was approved in 2019. It is a fitting coincidence that ten years later, on the same day, ISRO is gearing up for the first un-crewed mission of Gaganyaan, by commencing the stacking of human-rated LVM3, christened HLVM3, at SDSC-SHAR.
Спойлер

Commencement of stacking of Human-rated LVM3 (HLVM3)
ISRO has come a long way from the experimental mission of LVM3-X/CARE mission. The human rated launch vehicle, HLVM3, is derived from LVM3 and designed with enhanced reliability to meet human safety considerations. Additionally, a Crew Escape System (CES) is implemented to ensure crew safety by safe ejection of Crew Module (CM) in a potentially adverse situation. The CES is operational from the launch pad till its separation after the atmospheric flight regime. HLVM3 is a three-stage vehicle with a payload capacity of about 10 tonnes to LEO. The vehicle is 53 meters tall and weighs 640 tonnes. The vehicle is getting ready for launch with the Crew Module and associated systems undergoing final checks at ISRO centres.
The primary objective of the LVM3-X/CARE mission was to validate the vehicle's flight through the atmospheric regime and demonstrate the re-entry of a full-scale Crew Module into Earth's atmosphere. The mission achieved several critical technical milestones, including the flight validation of the LVM3 vehicle, synchronized performance of the paired S200 solid rocket boosters, twin-engine operation of the Vikas engines in L110 stage, control-sharing algorithms across L110 and S200 stages, and complex separation mechanisms. The success also validated the entire integration, assembly, testing, and launch servicing processes, as well as the mission design and simulation cycles, ensuring readiness for future missions. The CARE experiment itself served as a platform to evaluate the aerothermal performance of the Crew Module and validate critical re-entry technologies. It successfully demonstrated blunt-body re-entry aerodynamics, thermal protection systems, parachute-based deceleration mechanisms, and recovery logistics, providing invaluable insights for further developments.
The success of the LVM3-X/CARE mission was instrumental in ISRO's journey toward self-reliance in launching heavier satellites. LVM3 has since completed seven successive successful launches. The insights gained from the CARE mission have also been pivotal in shaping ISRO's human spaceflight program. Iterations in the Crew Module design, along with subsequent pad abort tests, air-drop tests and test vehicle flights, are built on the foundational data provided by CARE.
The human-rating of LVM3 has been completed and all systems have been tested for enhanced reliability. Ground tests and flight tests in off-nominal conditions have ensured the performance of these systems in line with human safety requirements. The addition of the highly reliable Crew Escape System (CES) has further increased confidence for the manned missions planned by ISRO. Escape provision exists for the crew during all phases of ascent till injection of the module into orbit.
As India prepares for its maiden human spaceflight under the Gaganyaan programme, the legacy of the LVM3-X/CARE mission becomes more relevant. The Crew Module designed with enhanced safety margins and multiple redundancies, will fly aboard the Human-rated LVM3, ensuring the safety of the Gaganyatris. The data gained through the un-crewed flights will be instrumental for the success of the manned missions. Further, the experience from Gaganyaan programme will play a vital role in the construction and operationalization of the Bharatiya Antariksh Station (BAS). This ambitious endeavour reflects ISRO's long-term vision and foresight to leverage established heritage for advancing India's space sector.
Dr. S Somanath, Mission Director of the LVM3-X/CARE mission now serves as the Secretary of the Department of Space and Chairman of ISRO, while Dr. S Unnikrishnan Nair, the Payload Director of the LVM3-X/ CARE mission became the founding Director of the Human Space Flight Centre (HSFC), Bengaluru and now leads the Vikram Sarabhai Space Centre (VSSC), Thiruvananthapuram.
[свернуть]
At 8.45 Hrs on 18thDecember, 2024 at SDSC, the stacking of the nozzle end segment with full flex seal nozzle of the S200 motor took place, thus commencing the official launch campaign of the HLVM3-G1 / OM-1 mission.
Preparation of both the S200 motors will now take place with the assembly of segments, control systems and avionics. L110 and C32 stages for the HLVM3 are ready at the launch complex. The Crew escape systems elements are also received at SDSC. The integration of Crew Module is happening at VSSC and the integration of Service Module at URSC. The Orbital Module (OM) level integration and tests will take place subsequently at URSC, Bangalore.
Commencement of stacking of Human-rated LVM3 (HLVM3)  Commencement of stacking of Human-rated LVM3 (HLVM3)
Началась сборка РН.

zandr

https://x.com/debapratim_/status/1891505502183407962
ЦитироватьDebapratim  @debapratim_
Picture of the C32 hydrolox upper stage, which will be used on HLVM3 in the Gaganyaan-G1 mission!
This is the first C32 stage built by ISRO! It is an upgraded version of the C25 upper stage, which used to fly on LVM3 until now.

zandr