TIBA-1, Inmarsat GX5 - Ariane 5 ECA (VA250) - Kourou ELA-3 - 26.11.2019, 21:23 UTC

Автор tnt22, 17.10.2019 22:33:35

« назад - далее »

0 Пользователи и 2 гостей просматривают эту тему.

tnt22

Опубликована брошюра миссии

DDP-VA250-GB-final.pdf - 1.6 MB, 10 стр, 2019-11-15 13:16:50 UTC

DDP-VA250-FR-final.pdf - 1.6 MB, 10 стр, 2019-11-15 13:16:48 UTC


tnt22


tnt22


tnt22


tnt22


tnt22


tnt22


tnt22


tnt22

Цитировать Association des amis de l'activité spatiale dans le monde
14 November at 06:43 · 

ARIANE 5 ECA VOL 250 - TIBA-1 et INMARSAT GX5.

Установка КА TIBA-1 на Sylda










tnt22

Цитировать Association des amis de l'activité spatiale dans le monde
22 hrs · 

ARIANE 5 ECA VOL 250 - TIBA-1 et INMARSAT GX5.

Установка КА TIBA-1 и SYLDA под головной обтекатель.










tnt22

Брошюра миссии перевыпущена (заметил одно исправление, косметические правки)

VA250-launchkit-EN2.pdf- 3.0 MB, 10 стр, 2019-11-18 13:56:57 UTC

VA250-launchkit-FR2.pdf - 2.9 MB, 10 стр, 2019-11-18 13:57:06 UTC

Исправлена

(приведена в соответствие с циклограммой на стр 8.)

tnt22

NOTMARs
ЦитироватьNAVAREA IV 1007/19

WESTERN NORTH ATLANTIC.
FRENCH GUIANA.
1. HAZARDOUS OPERATIONS, ROCKET LAUNCHING
2058Z TO 0002Z COMMENCING DAILY
22 NOV THRU 16 DEC IN AREA BOUND BY
     05-18.00N 52-47.40W, 05-22.35N 52-33.83W,
     05-11.16N 52-24.63W, 05-09.00N 52-36.00W.
2. CANCEL THIS MSG 170102Z DEC 19.//

Authority: AVURNAV CAYENNE 33/19 121035Z NOV 19.

Date: 170413Z NOV 19
Cancel: 17010200 Dec 19


HYDROLANT 3527/19

ATLANTIC OCEAN.
1. HAZARDOUS OPERATIONS, ROCKET LAUNCHING:
    A. 2058Z TO 0002Z COMMENCING DAILY
        22 NOV THRU 16 DEC IN AREA BOUND BY
        05-36N 048-21W, 05-37N 047-22W,
        05-06N 047-21W, 05-04N 048-20W.
    B. 2058Z TO 0002Z COMMENCING DAILY
        22 NOV THRU 16 DEC IN AREA BOUND BY
        05-23N 047-12W, 05-22N 045-27W,
        05-07N 045-27W, 05-08N 047-12W.
    C. 2107Z TO 0047Z COMMENCING DAILY
        22 NOV THRU 16 DEC IN AREA BOUND BY
        03-03N 014-45W, 01-15N 000-23E,
        00-31S 000-10E, 01-16N 014-57W.
2. CANCEL THIS MSG 170147Z DEC 19.//

Authority: FRENCH GUIANA 121017Z NOV 19.

Date: 172254Z NOV 19
Cancel: 17014700 Dec 19

tnt22

Из МордоКниги

Нанесение логотипов на ГО (13 ноября 2019)
Цитировать

tnt22

https://www.arianespace.com/mission-update/va250-ariane-5-payload-integration/
ЦитироватьAriane 5 | November 18, 2019
Arianespace integrates TIBA-1 and Inmarsat GX5 for Ariane 5 launch on November 22

The Ariane 5 for Arianespace's eighth mission of 2019 is now fully assembled following integration of its two satellite passengers at the Spaceport in French Guiana.


Ariane 5's payload fairing – containing TIBA-1 – is lowered for installation atop the Inmarsat GX5 co-passenger.

During activity in Ariane 5's Final Assembly Building, the upper payload component – containing TIBA-1, mounted on its SYLDA dispenser system and protected by an ogive-shaped fairing – was lowered into position over Inmarsat GX5, which was previously installed atop the launcher's central core.

This step clears the way for final checkout, which will enable the launch readiness review to be conducted on November 19, followed by Ariane 5's rollout to the Spaceport's ELA-3 launch zone the following Thursday, and an early evening liftoff on Friday, November 22.

The upcoming mission is designated Flight VA250 in Arianespace's numbering system, and it will deliver the two satellites into geostationary transfer orbit.

Payload performance

To be deployed first during the 34-minute flight sequence is TIBA-1 – a communications spacecraft for the Government of Egypt, developed by Thales Alenia Space and Airbus Defence and Space as co-prime contractors, with Thales Alenia Space acting as lead partner of the contract. It will perform a dual mission in Ka-band for secure and broadband communications, operating fr om an orbital position at 35.5 deg. East.

The second passenger – Inmarsat GX5, which was produced by Thales Alenia Space – is a very high throughput communications satellite that will be fully integrated into Inmarsat's current Global Xpress high-speed network. To be located in a geostationary orbit at 11 deg. East, it is equipped 72 Ka-band fixed spot beams and four steerable beams to direct additional capacity wh ere it is needed.

Ariane 5 will deliver a total payload lift performance of approximately 10,495 kg. during the mission – with this combined mass factoring in TIBA-1 and Inmarsat GX5, plus the launch vehicle's dual-passenger dispenser system and satellite integration hardware.
    [/li]
  • A larger version of the photo above is available in the Gallery.
Launch window for Flight VA250:[TH]
Washington, D.C.
[/TH][TH]
French Guiana
[/TH][TH]
UTC
[/TH][TH]
Paris
[/TH][/TR][TR][TD]
Between 4:08 p.m. and 5:43 p.m.
[/TD][TD]
Between 6:08 p.m. and 7:43 p.m.
[/TD][TD]
Between 21:08 and 22:43
[/TD][TD]
Between 10:08 p.m. and 11:43 p.m.
[/TD][/TR][/TABLE]

tnt22


tnt22

Цитировать Stéphane Israël‏ @arianespaceceo 6 мин. назад

#Ariane5 has been cleared for liftoff! Approval for #Arianespace's Flight #VA250 w/ #TIBA1 and @InmarsatGlobal #GX5 – scheduled for Nov. 22 – came at the conclusion of today's launch readiness.
@Thales_Alenia_S @AirbusSpace



tnt22

https://www.arianespace.com/mission-update/va250-launch-readiness-review/
ЦитироватьAriane 5 | November 20, 2019
Arianespace receives "green light" for its upcoming Ariane 5 launch with TIBA-1 and Inmarsat GX5

The next Arianespace Ariane 5 flight has been authorized for liftoff on November 22 following today's launch readiness review, which was conducted at the Spaceport in French Guiana.



This milestone confirmed that the heavy-lift launcher and its dual-satellite payload – comprised of TIBA-1 and Inmarsat GX5 – are flight-ready, along with the Spaceport's infrastructure and the network of downrange tracking stations.

With approval granted, Ariane 5 is cleared for tomorrow's rollout from the Final Assembly Building to the ELA-3 launch zone. Liftoff will occur the following day during a 1-hour, 35-minute launch window that opens at 6:08 p.m. local time in French Guiana.

Ariane 5 will deliver a total payload lift performance of approximately 10,495 kg. on the mission to geostationary transfer orbit (GTO), which is designated Flight VA250. This total includes the two satellite passengers, plus the workhorse vehicle's dual-payload deployment system and integration hardware.

Dual-payload deployment by Ariane 5

To be deployed first during the flight sequence is TIBA-1 – a communications spacecraft for the Government of Egypt, developed by Thales Alenia Space and Airbus Defence and Space as co-prime contractors, with Thales Alenia Space acting as lead partner of the contract.

Inmarsat GX5 – which was produced by Thales Alenia Space and will be released after TIBA-1 – is a very high throughput communications satellite that will be fully integrated into Inmarsat's current Global Xpress high-speed network.

Arianespace's November 22 mission will mark the eighth flight in 2019 by its launch vehicle family – which consists of the heavy-lift Ariane 5, medium-size Soyuz and lightweight Vega. It will be the fourth this year using Ariane 5.
    [/li]
  • A larger version of the photo above is available in the Gallery.
Launch window for Flight VA250:[TH]
Washington, D.C.
[/TH][TH]
French Guiana
[/TH][TH]
UTC
[/TH][TH]
Paris
[/TH][TH]
Cairo
[/TH][/TR][TR][TD]
Between 4:08 p.m. and 5:43 p.m. on Nov. 22
[/TD][TD]
Between 6:08 p.m. and 7:43 p.m. on Nov. 22
[/TD][TD]
Between 21:08 and 22:43 on Nov. 22
[/TD][TD]
Between 10:08 p.m. and 11:43 p.m. on Nov. 22
[/TD][TD]
Between 11:08 p.m. and 12:43 a.m. on Nov. 22-23
[/TD][/TR][/TABLE]

tnt22


tnt22

Официальная трансляция пуска на ТыТрубе

Цитировать
Начало трансляции: за 20 мин до пуска