Microsat-R - PSLV-С44 (DL) - Шрихарикота 1 - 24.01.2019 - 21:08 ДМВ

Автор Salo, 15.01.2019 12:14:13

« назад - далее »

0 Пользователи и 1 гость просматривают эту тему.

Salo

Microsat-R 13 января доставлен на космодром.
http://www.andhrabhoomi.net/content/ap-12355

"Были когда-то и мы рысаками!!!"

Salo

https://www.thehindu.com/news/national/kerala/pslv-lift-off-with-added-features/article25981654.ece
ЦитироватьPSLV lift-off with added features
  Tiki Rajwi
 Thiruvananthapuram,     January 12, 2019 23:09 IST
 Upd ated: January 12, 2019 23:09 IST
 
 
 The upcoming mission will see a new variant of the PSLV in use
 
With the Indian Space Research Organisation (ISRO) planning to keep the fourth and final stage of the Polar Satellite Launch Vehicle (PSLV) 'alive' in space as a useful 'orbital platform', the rocket — popularly dubbed ISRO's trusted workhorse — is getting added features.
Se t for lift-off this month with the Microsat-R payload, the upcoming PSLV-C44 mission will see a new variant of the PSLV in use.
This variant, tagged PSLV-DL, will be the first to sport two strap-on boosters for providing added thrust.
Lithium-ion cells
Its final and fourth stage — PS4 — will be equipped with lithium-ion batteries, but no solar panels.
An in-house technology, the lithium-ion cells are critical to keep the spent stage in orbit. Solar panels will be added, in all likelihood, in the next mission, VSSC director S. Somanath says.
The ISRO had hit upon the idea of transforming the expendable fourth stage into a makeshift satellite to reduce space debris.
In normal scenario, the initial stages of the rocket, once they detach, drop back into the sea.
 
'Recycling'
 However, stage four, after releasing the payload, wanders around in space as junk.
If the ISRO plan is successful, the spent stage will be automatically 'recycled' into a valuable platform for space-based experiments.
The VSSC director said that the ISRO would perfect the technology with tests spread over multiple missions.
"We are doing it incrementally. In the PSLV-C44 mission, the platform will be demonstrated. "We have to show that the PS4 stage can be kept 'alive' for more than one orbit. After the regular payloads are injected into their orbits, we will shift the spent stage to another orbit and keep it there and demonstrate that it is live," he said.
On the C44 mission, the ISRO will also test the downloading of data from the stage to the ground station. In subsequent missions, the space agency will carry out experiments using the platform.
A number of experiments are under consideration, though nothing has been finalised. The PSLV, which first flew successfully in 1994, has evolved over the years.
Of the current configurations in use, PSLV-XL employs six strap-on boosters while the 'core alone' has none.

Twin boosters
On the new 'DL' type, the twin boosters will burn at lift-off to give additional thrust to the rocket. The boosters will carry 12 tonnes of propellant.
In all other respects, the 44-metre-tall PSLV will have standard features.
"Были когда-то и мы рысаками!!!"

tnt22

Открыта страница миссии

https://www.isro.gov.in/launcher/pslv-c44
Цитировать
PSLV-C44
India's Polar Satellite Launch Vehicle (PSLV), in its 46th flight, will launch the Kalamsat and Microsat-R from the First Launch Pad (FLP) of Satish Dhawan Space Centre SHAR, Sriharikota on January 24, 2019.

PSLV is a four stage launch vehicle with alternating solid and liquid stages. The PSLV with 2 strap-on configuration has been identified for this mission and the configuration is designated as PSLV-DL. PSLV-C44 is the first mission of PSLV-DL and is a new variant of PSLV.

In PSLV-C44, the fourth stage (PS4) of the vehicle will be moved to higher circular orbit so as to establish an orbital platform for carrying out experiments. Kalamsat, a student payload will be the first to use PS4 as orbital platform.

PSLV-C44 will also carry Microsat-R, an imaging satellite

tnt22


tnt22


tnt22

NOTAM

ЦитироватьVOMF
 
A0122/19 (Issued for VOMF PART 1 OF 4) - PSLV-C44 ROCKET LAUNCH FM SHAR RANGE,SRIHARIKOTA WILL TAKE
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE
INTIMATED 24 HR IN ADVANCE THROUGH A SEPARATE NOTAM.
LAUNCH PAD COORD: 13 43.9N 080 14.2E
NO FLT IS PERMITTED OVER THE DNG ZONES.
DNG ZONE -1:   IS A CIRCLE OF 10NM AROUND THE LAUNCHER.
DNG ZONE -2:   IS A SECT BTN 15NM AND 60NM  FM LAUNCH PAD COORD AND
BTN AZM ANGLES 130  AND 150 FM TRUE NORTH.
DNG ZONE -3
I.     1145N 08120
II.     1210N 08150
III.     1015N 08315
IV.     0950N 08245
DNG ZONE 4
I.     0900N 08310
II.     0900N 08355
III.     0715N 08355
IV.     0715N 08320
DNG ZONE 5
I.     0100N 08125
II.     0040N 08325
III.     0405S 08230
IV.     0345S 08030
END PART 1 OF 4. 1730-2130, 24 JAN 17:30 2019 UNTIL 22 FEB 21:30 2019. CREATED:
16 JAN 12:22 2019
 
A0122/19 (Issued for VOMF PART 2 OF 4) - DNG ZONE 6
I.     2415S 07445
II.     2500S 08000
III.     3400S 07800
IV.     3500S 07500
V.     3700S 07145
ROUTES AFFECTED IN CHENNAI FIR
W20, A465, P574, B466, L896, N563, N564, Q11, Q10,Q23, Q24, V3, V4,
V6, V8, V9, P761, T3
CLOSURES/ALTN ROUTING FOR OVERFLYING
1)W20 NOT AVBL BTN MMV-KAMGU
ALTN RTE:  MMV -DOHIA - MM610 -RAMDO - KAMGU (BI DIRECTIONAL)
2)Q24 NOT AVBL BTN MMV- KAMGU
ALTN RTE:MMV - DOHIA - MM610 -RAMDO - KAMGU (UNI DIRECTIONAL)
3)Q10 NOT AVBL BTN MMV-SUGAN
ALTN RTE: MMV -DOHIA -MM610- RAMDO-RINTO-SUGAN (UNI DIRECTIONAL)
4)Q11 NOT AVBL BTN GURAS - MMV
ALTN RTE: KASRO -RINTO - GUANI -MMV (UNI DIRECTIONAL)
5)A465 NOT AVBL  BTN AKMIL - DOKET
ALTN RTE: AKMIL-PT P (1238N 08107E)-VATMO- DOKET (BI DIRECTIONAL)
6)Q23 NOT AVBL BTN RINTO - MMV
ALTN RTE: RINTO -GUANI -MMV (UNI DIRECTIONAL)
7)P574 NOT AVBL BTN MMV - GIRNA
END PART 2 OF 4. 1730-2130, 24 JAN 17:30 2019 UNTIL 22 FEB 21:30 2019. CREATED:
16 JAN 12:22 2019

tnt22

Ещё NOTAM (на 3 пусковых дня)

ЦитироватьYMMM
 
F0083/19 - FLW RECEIVED FROM GOVERNMENT OF INDIA:
PSLV C44 ROCKET LAUNCH FROM INDIA IS NOW SCHEDULED.
2 DANGER ZONES EFFECT YMMM:
 
ZONE 5 BOUNDED BY
0100N 08125E
0040N 08325E
0405S 08230E
0345S 08030E
TO BEGINNING
 
ZONE 6 BOUNDED BY
2415S 07445E
2500S 08000E
3400S 07800E
3500S 07500E
3700S 07145E
TO BEGINNING. SFC - UNL, DAILY 1730/2130, 24 JAN 17:30 2019 UNTIL 26 JAN 21:30 2019. CREATED: 11 JAN 23:40 2019

tnt22

ЦитироватьISRO‏Подлинная учетная запись @isro 11 ч. назад

#ISROMissions

#PSLVC44 to launch #Kalamsat and #MicrosatR from Satish Dhawan Space Centre, Sriharikota on January 24. Kalamsat is a student payload while Microsat-R is an imaging satellite.

Stay tuned for updates.


tnt22


tnt22

Брошюра миссии обновлена и дополнена (пополнена фотогалерея, частично изменён дизайн страниц)

pslv-c44_launch_kit_0.pdf - 4.4 MB, 6 стр, 2019-01-17 06:12:49 UTC

tnt22

NOTMAR

ЦитироватьHYDROPAC 176/2019 (61,63)

BAY OF BENGAL.
INDIAN OCEAN.
INDIA.
DNC 03.
1. HAZARDOUS OPERATIONS, ROCKET LAUNCHING
   1730Z TO 2130Z DAILY 24 THRU 26 JAN IN AREAS:
   A. WITHIN TEN MILES OF 13-43.9N 080-14.2E.
   B. WITHIN 60 MILES OF
   13-43.9N 080-14.2E
   BETWEEN 130 DEGREES AND 150 DEGREES.
   C. BOUND BY
   11-45N 081-20E, 12-10N 081-50E,
   10-15N 083-15E, 09-50N 082-45E.
   D. BOUND BY
   09-00N 083-10E, 09-00N 083-55E,
   07-15N 083-55E, 07-15N 083-20E.
   E. BOUND BY
   01-00N 081-25E, 00-40N 083-25E,
   04-05S 082-30E, 03-45S 080-30E.
   F. BOUND BY
   24-15S 074-45E, 25-00S 080-00E,
   34-00S 078-00E, 35-00S 075-00E,
   37-00S 071-45E.
2. CANCEL THIS MSG 262230Z JAN 19.

( 171129Z JAN 2019 )

tnt22


tnt22


tnt22


tnt22


tnt22

Обновление фотогалереи:

Добавлены 6 снимков
Цитировать

tnt22

ЦитироватьISRO‏Подлинная учетная запись @isro 3:00 - 23 янв. 2019 г.

#ISROMissions

#PSLVC44 sits pretty on the launchpad at the Satish Dhawan Space Centre in Sriharikota under the watchful eyes of the #Moon, ahead of its midnight launch tomorrow (Jan 24), carrying #Kalamsat and #MicrosatR.

Updates will continue.


tnt22

Видео из #12 на ТыТрубе
ЦитироватьPSLV-C44 / MicroSat-R Mission Curtain Raiser Video

defence and space updates

Опубликовано: 22 янв. 2019 г.
https://www.youtube.com/watch?v=MJJjFQvEoQwhttps://www.youtube.com/watch?v=MJJjFQvEoQw (4:14)

tnt22

#18
ЦитироватьISRO‏Подлинная учетная запись @isro 7:45 - 23 янв. 2019 г.

#ISROMissions

Countdown for the launch of #PSLVC44 started today at 19:37 (IST) at Satish Dhawan Space Centre, Sriharikota. The launch is scheduled tomorrow at 23:37 (IST).
Updates will continue.

#Kalamsat
#MicrosatR
18:07 UTC 24.01.2019

tnt22

https://www.isro.gov.in/update/24-jan-2019/pslv-c44-mission-propellants-filling-of-fourth-stage-ps4-of-pslv-c44-completed
ЦитироватьJan 24, 2019

PSLV-C44 Mission - Propellants filling of fourth stage (PS4) of PSLV-C44 completed
https://www.isro.gov.in/update/24-jan-2019/pslv-c44-mission-filling-of-oxidizer-n204-second-stage-ps2-completed
ЦитироватьJan 24, 2019
PSLV-C44 Mission - Filling of oxidizer (N204) for the second stage (PS2) completed
https://www.isro.gov.in/update/24-jan-2019/pslv-c44-mission-filling-of-propellant-uh25-second-stage-ps2-of-pslv-c44
ЦитироватьJan 24, 2019
PSLV-C44 Mission - Filling of propellant UH25 for second stage (PS2) of PSLV-C44 commenced.
https://www.isro.gov.in/update/24-jan-2019/pslv-c44-mission-filling-of-propellant-uh25-second-stage-ps2-of-pslv-c44-0
ЦитироватьJan 24, 2019
PSLV-C44 Mission - Filling of propellant UH25 for the second stage (PS2) of PSLV-C44 completed