Тематические разделы => Прикладная космонавтика => Тема начата: che wi от 30.11.2016 19:26:41

Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 30.11.2016 19:26:41
GSLV-Mk III next for Isro to be launched in January (http://www.deccanchronicle.com/science/science/301116/gslv-mk-iii-next-for-isro-to-be-launched-in-january.html)

ЦитироватьChennai: The 640-tonne GSLV Mk-III, Isro's heaviest rocket till date, is likely to be launched in January as some stages of the rocket are still undergoing tests.

Isro first had planned to launch the heavy rocket in December end. But the largest cryogenic engine CE-20 developed for this rocket is yet to be delivered as it is undergoing tests at Isro's Propulsion Complex (IPRC) in Mahendragiri, Tamil Nadu.

The indigenous first developmental vehicle is capable of placing the 4-tonne class GSAT satellites into the Geostationary Transfer Orbit. The 43.43-metre tall vehicle has the liquid and cryogenic stage and two S200 solid rocket boosters.

"All the systems are now getting ready. The L110 and S200 stages are already delivered to Satish Dhawan Space Centre in Sriharikota. The cryogenic engine CE-20 is still not delivered as the engine tests are going on," K.Sivan, director, Vikram Sarabhai Space Centre (VSSC), Thiruvanan thapuram told Deccan Chronicle.

The cryogenic stage for the vehicle is expected to be delivered sometime in December. "The exact date for the launch will be finalised only when we finish our tests. It's not like PSLV or GSLV launches. It's a new stage, new testing and some new observations will be there and we have to solve the teething issues. In all likelihood, the launch may go to January," he said.

GSLV-Mk-III rocket will launch the 3.2-tonne GSAT-19 satellite into the Geosynchronous Transfer Orbit. "GSLV-Mk-III will launch the satellite like our regular GSLV rocket," K.Sivan said.

The 25-metre height solid rocket boosters will burn 207 tonne of solid propellant each to give the required thrust to lift off the vehicle. The GSAT-19 satellite will carry Ka and Ku-band payload along with a Geostationary Radiation Spectrometer (GRASP) payload to monitor and study the nature of the charged particles and influence of space radiation on spacecraft and electronic components.

Earlier, Isro had tested the 3,775 kg Crew Module Atmospheric Re-entry Experiment (CARE) using the GSLV-Mk-III rocket which flew with a passive cryogenic stage. The module re-entered the atmosphere from the height of 126 km and deployed its parachutes as planned and splashed down in the Bay of Bengal.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 30.11.2016 19:30:35
Цитировать/.../

Департамент также сообщил о готовящемся в первом квартале пуске ракеты-носителя GSLV–D1 с криогенной ступенью. Ракета выведет на орбиту коммуникационный спутник GSAT-19. В сентябре Индия впервые применила криогенную ступень в рабочем порядке во время запуска метеорологического спутника INSAT-3DR. В более ранних пусках ее включали в тестовом режиме.

В департаменте космических исследований рассчитывают, что грузоподъемность GSLV–D1 будет доведена до 4 тонн полезной нагрузки. Также индийские ученые рассчитывают получить одобрение на развитие полукриогенной ступени. Они уже разрабатывают такой двигатель и ожидают, что полукриогенная ступень будет готова в течение пяти лет.
https://ria.ru/space/20161130/1482536974.html
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Alex_II от 30.11.2016 21:23:44
Цитироватьche wi пишет:
индийские ученые рассчитывают получить одобрение на развитие полукриогенной ступени.
Что за зверь такой "полукриогенная ступень"? Кислород-керосин что ли?
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 30.11.2016 21:28:19
ЦитироватьAlex_II пишет:
Кислород-керосин что ли?
Не просто керосин, а ISROсин )
немного здесь (http://www.isro.gov.in/sites/default/files/article-files/right-to-information/annual_report-15-16.pdf) на стр. 79-80
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Alex_II от 01.12.2016 02:32:44
Цитироватьche wi пишет:
Не просто керосин, а ISROсин )
Да хоть отсосин, дело то не в названии... Вместо того, чтобы сделать двигло на обыкновенном авиакеросине - зачем-то щёки надувают... Хотя планы на 200-тонник мне нравятся...
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 04.12.2016 15:22:07
Возможно, к данному пуску

GSLV engine tested at Mahendragiri (http://www.thehindu.com/news/cities/Madurai/GSLV-engine-tested-at-Mahendragiri/article16756493.ece)

ЦитироватьThe Indian Space Research Organisation (ISRO) successfully conducted the test of the Geosynchronous Satellite Launch Vehicle Mk III's indigenous cryogenic CE-20 engine at ISRO Propulsion Complex in Mahendragiri in the district on Saturday.

The CE-20 was ignited and tested for 25 seconds from 7.20 p.m. in the presence of A.S. Kiran Kumar, Chairman, ISRO, to study the performance of the engine that will play a pivotal role in the rocket weighing about 4 tonne.

"The engine, which will get ignited at high altitude in vacuum during actual flight, performed exceptionally well to meet all predetermined goals," said sources in the ISRO Propulsion Complex.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 07.12.2016 14:57:50
Сегодня после успешного запуска Resourcesat-2A директор Космического центра им. Викрама Сарабхая сказал, что пуск GSLV-D1 планируется на 20 января.

ЦитироватьSivan said GSLV MK III is scheduled for launch on January 20, 2017.
http://timesofindia.indiatimes.com/india/ISRO-successfully-launches-remote-sensing-satellite-Resourcesat-2A-into-orbit/articleshow/55848146.cms
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 18.01.2017 12:38:45
High Altitude Flight Acceptance Test of CE20 Engine Conducted Successfully (http://www.isro.gov.in/high-altitude-flight-acceptance-test-of-ce20-engine-conducted-successfully)

ЦитироватьGSLV MKIII, the future launch vehicle of ISRO, capable of launching 4-ton class spacecraft into Geosynchronous Transfer Orbit (GTO) is in the advanced stage of realisation. It consists of two solid strap-on (S200) motors, one earth storable liquid core stage (L110) and the indigenously developed C25 cryogenic stage. The C25 stage is powered by CE20 cryogenic engine. The first CE20 flight engine acceptance test was successfully conducted for a duration of 25 seconds in high altitude simulation test facility during December 2016. This flight acceptance test is an important milestone for ISRO as it could successfully cross the major engine development endeavors in the maiden attempt. This engine was conceived, configured, designed, fabricated and developed by Liquid Propulsion Systems Centre (LPSC).

LPSC is the centre for design, development and realisation of liquid propulsion stages for ISRO's Launch Vehicles. Development of fluid control valves, transducers, propellant management devices for vacuum conditions and other key components of liquid propulsion systems are also under the purview of LPSC.

To test the Engine at flight identical conditions, High Altitude Test (HAT) facility was established at IPRC, Mahendragiri. This facility allows testing of the CE20 engine at its full area ratio in vacuum condition which otherwise would experience flow separation at sea level ambient pressures.

The successful engine testing in the high altitude conditions was preceded by multiple tests on two engines with sea level nozzle divergent (area ratio 10). The development test conducted on these engines provided confidence in their design. The design of the flight nozzle was also validated in the medium duration High Altitude Test programme.

The Engine High Altitude Test Programme contained a series of high altitude tests (5 hot tests with a cumulative duration of 41.20 sec) to demonstrate the vacuum ignition, validate the nozzle performance, propellant flow build up characteristics, chill down performance and to demonstrate the ignition margins. All the test objectives were successfully achieved in this test programme. The testing of engine in HAT facility has also helped in finalising the engine start and shut down sequence for flight. Summing up, the test programme has imparted good confidence on the performance and functioning of CE20 Engine in GSLV MKIII (LVM3)-D1 mission.

The realisation of flight stage for the GSLV MKIII (LVM3)-D1 mission is in progress and the first mission is expected by early 2017.
(https://forum.novosti-kosmonavtiki.ru/forum/file/68270)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 19.01.2017 11:35:12
Пуск отложен до марта-апреля.

Isro postpones GSLV Mk-III launch to March (http://www.deccanchronicle.com/science/science/190117/isro-postpones-gslv-mk-iii-launch-to-march.html)

ЦитироватьChennai: Isro has postponed its heaviest rocket GSLV Mk-III's launch due to pending tests to be conducted on the vehicle. Now, the rocket will either be launched in March or April after completing the tests.

Earlier, the space organisation tentatively planned to launch it on January 20. The GSLV Mk-III rocket will launch the 3.2 tonne GSAT-19 satellite.

"Subsequently, some more tests are planned for the vehicle and the stage level tests also got delayed. Now, these tests will be conducted this month. If any issues arise during the tests we will correct them," K. Sivan, director, Vikram Sarabhai Space Centre (VSSC), Thiruvananthapuram told Deccan Chronicle.

The high altitude test for GSLV Mk-III's large cryogenic engine CE-20 was conducted in December. Isro also plans to send the Saarc satellite with GSLV Mk-II rocket in March.

"We are planning to launch both the GSLV Mk-III and GSLV Mk-II rockets in March and April. Maybe one will be launched in March and another one in April depending on the availability of the launch pad," he said.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 30.01.2017 11:51:35
Цитировать... the next launch lined up in April is the GSLV-Mark III to place the indigenous communication satellite GSAT-19 in orbit
http://timesofindia.indiatimes.com/home/science/isro-centres-set-for-the-record-launch-of-104-satellites-at-one-go-by-february-15/articleshow/56856368.cms
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 18.02.2017 11:58:37
ISRO Successfully Tests its Cryogenic Stage (C25) for GSLV MkIII for the Flight Duration (http://www.isro.gov.in/update/18-feb-2017/isro-successfully-tests-its-cryogenic-stage-c25-gslv-mkiii-flight-duration)

ЦитироватьThe Indian Space Research Organisation (ISRO) successfully tested its indigenously developed Cryogenic Upper Stage (CUS) for GSLV MkIII on February 17, 2017. The cryogenic stage designated as C25 was tested for a flight duration of 640 seconds at ISRO Propulsion Complex (IPRC) in Mahendragiri. C25 Stage had earlier been tested successfully for 50 seconds on January 25, 2017 to validate all the systems.

Спойлер
Prior to Stage development hot tests, three CE20 engines were realised and two engines were subjected to qualification tests in sea level conditions. This included 800 seconds duration hot test and the third engine identified for flight was tested in high

Altitude conditions for a duration of 25 seconds.

This Stage test is a significant milestone as it is the last in series of engine and stage development hot tests before the first development flight of GSLV MkIII.

The C25 stage is the most powerful upper stage developed by ISRO and uses Liquid Oxygen (LOX) and Liquid Hydrogen (LH2) propellant combination.  The stage carries 27.8 tons of propellants loaded in two independent tanks. Development of a cryogenic stage has unique design challenges, with liquid Hydrogen stored at -253 deg C and liquid Oxygen stored at -195 deg C in its tanks. To store these cryogenic fluids, special multi-layer insulation is provided for the tanks and other structures.

The development of the cryogenic stage was led by Liquid Propulsion Systems Centre (LPSC) with support from various System Development Agencies from other ISRO Centres of ISRO, viz., Vikram Sarabhai Space Centre (VSSC), ISRO Propulsion Complex (IPRC) and Sathish Dhawan Space Centre (SDSC), SHAR.

The Cryogenic Stage development tests were carried out in two phases.  First, the Stage was subjected to fluid mock-up, wherein the stage preparation and servicing at launch complex in SDSC, SHAR, Shriharikota was completed to prove all the ground facilities established for servicing the cryogenic stage. This was followed by testing of the Stage at ISRO Propulsion Complex, Mahendragiri. From the Stage realisation to completion of testing was accomplished in four months.

The performance of the Stage during the hot test was as predicted. Successful hot test for flight duration qualifies the design of the stage and the robustness of the facilities conceived and established towards its development.

The flight cryogenic stage is in advanced stage of realisation, and forms the upper stage of GSLV MkIII the next generation launch vehicle of ISRO, capable of launching 4 ton class satellites into Geosynchronous Transfer Orbit (GTO). The vehicle consists of two solid strap-ons (S200) motors, one earth storable liquid core stage (L110) and the Cryogenic Upper Stage (C25).
[свернуть]
The GSLV MkIII vehicle integration activities are in progress at SDSC, SHAR for its first development flight (GSLV MkIII-D1) targeted for April 2017.
(https://forum.novosti-kosmonavtiki.ru/forum/file/68682)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: zandr от 18.02.2017 23:16:03
http://tass.ru/kosmos/4035798
ЦитироватьИндия успешно испытала собственный криогенный двигатель для тяжелой ракеты-носителя
НЬЮ-ДЕЛИ, 18 февраля. /Корр. ТАСС Евгений Пахомов/. Индийская организация космических исследований провела успешное испытание криогенного двигателя собственной разработки, предназначенного для тяжелой ракеты-носителя нового поколения. Как сообщает телеканал NDTV (http://www.ndtv.com/india-news/isro-tests-indias-largest-cryogenic-engine-for-400-ton-rocket-1660935?pfrom=home-lateststories), силовой агрегат проработал полные 10 минут.
Испытания состоялись днем ранее на территории двигателестроительного комплекса в Махендрагири на юге страны. Силовой агрегат предназначен для установки на новой индийской ракете-носителе GSLV Mark III  высотой около 50 м и весом более 414 тонн. Эти испытания стали последними перед запуском ракеты, который может состоятся в этом году, указывает телеканал.
Новый мощный носитель GSLV Mark III сможет выводить грузы до 10 тонн на низкую околоземную орбиту и до 4 тонн - на геосинхронную орбиту. Планируется также, что он может быть использован для выведения на орбиту первого индийского космического корабля с людьми на борту. В перспективе GSLV Mark III также предназначается для запуска межпланетных автоматических станций.
Как указывает NDTV, разработка нового двигателя потребовала почти 20 лет, поскольку в 1990-е годы Россия под давлением США была вынуждена отказаться от передачи индийской стороне технологий производства криогенных силовых установок. Создание такого двигателя - очень сложная задача, ее смогли решить только РФ, США, Франция, Китай, Япония и Индия, отмечает телеканал.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 19.02.2017 08:56:04
Rocket stage hot test - ISRO c25 640 seconds (https://www.youtube.com/watch?v=D-DikwGfe14)

https://www.youtube.com/watch?v=D-DikwGfe14 (https://www.youtube.com/watch?v=D-DikwGfe14)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 24.03.2017 08:14:38
Очередной сдвиг даты пуска, согласно индийским СМИ: конец мая - начало июня

ЦитироватьThe ISRO had planned to launch the heavy-lift vehicle carrying GSAT-19, a communication satellite, on April 20, but now the sources said the launch would take place only by May end or June first week.
http://www.newindianexpress.com/cities/chennai/2017/mar/23/isro-gears-up-to-flag-off-cryogenic-stage-on-march-27-1584688.html
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 20.04.2017 15:21:23
ЦитироватьISRO Chairman A S Kiran Kumar said that the developmental flight of a 'game-changer' rocket (launching vehicle) capable of launching a four-tonne class of satellites from Sriharikota spaceport will take place in the coming month. He said that ISRO views operationalisation of this rocket as a "game-changer" mission.
http://www.india.com/business/gslv-mk-iii-d1-isro-to-test-launch-four-tonne-capacity-game-changing-rocket-next-month-2045658/
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 04.05.2017 08:45:47
ЦитироватьMeanwhile Isro is also gearing up to launch its heaviest rocket GSLV-Mk III later this month and preparations are on for that at the rocket port. "The rocket's first and second stage or engines have been integrated. The satellite GSAT-19 and the cryogenic engine are also at the Sriharikota," an official said.
http://m.tech.firstpost.com/news-analysis/countdown-for-isros-south-asia-satellite-launch-on-board-the-gslv-f09-to-begin-today-374768.html
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 07.05.2017 22:19:33
http://economictimes.indiatimes.com/news/science/gslv-mark-iii-launch-why-isros-biggest-challenge-will-be-at-the-end-of-this-month/articleshow/58466879.cms
ЦитироватьGSLV Mark III launch: Why ISRO's biggest challenge will be at the end of this month

By HARI PULAKKAT, ET Bureau | Upd ated: May 02, 2017, 11.36 AM IST

Every engineer works under constraints. For those designing the third generation geostationary launch vehicle (GSLV), the main constraints were the launch facilities at Sriharikota and the capabilities of Indian industry. They could design a big rocket, but the Indian Space Research Organisation (Isro) would have had to build an expensive place to launch them. They would have also had to find companies to make the vehicle components, as making big rocket components was beyond industry capabilities.
Спойлер
When Isro started developing this rocket a decade and a half ago, it was far fr om being a thoroughbred organisation. It was not of great repute, its technical skills not cutting edge and its commercial potential, negligible. The first generation GSLV had just been test-flown, but its satellite had not reached its desired orbit. The GSLV Mark III was a complex vehicle and some of its critical technologies had to be developed from scratch. Isro's cryogenic engine development had hit hurdles and got delayed beyond reasonable measure.

However, by the turn of the century, Isro had shown glimpses of its current prowess. It had learned the art of making satellites. Its polar satellite launch vehicle (PSLV) had begun to put remote-sensing satellites into low earth orbit with precision, and this vehicle was slowly acquiring a reputation for reliability. The PSLV was relatively easier game.

The GSLV was a different matter altogether, requiring powerful solid motors and liquid engines in the early stages and a cryogenic engine on top. GSLV Mark III was conceived as a heavy lifter, by Indian standards, capable of putting communication satellites into a geostationary orbit, 36,000 km above the earth. A powerful cryogenic engine needed to be developed quickly.

(https://img.novosti-kosmonavtiki.ru/115729.webp)
[свернуть]
Isro is now readying the vehicle for its first full flight at the end of this month, roughly three weeks after another flight of the current generation GSLV on May 5. Isro has used new ideas in its design, necessitating new methods in manufacturing. Some of these ideas will be tested for the first time in a flight from Sriharikota. It would be the first flight of GSLV III using India's fully-indigenous cryogenic engine. If successful, it would also be India's first launch vehicle qualified for human space flight. "This vehicle is going to be at the frontier for Isro," says G Ayyappan, Mark III project director. "It can be used for human flight as well."
Спойлер
All of these combine to make it one of the most critical flights in Isro's history. Although the space technology frontier has moved on, promising to keep Isro engineers busy for a long time, GSLV Mark III is the culmination of all that Isro initially set out to do when first se t up in the 1960s. When fully ready, it would give Isro self-reliance and the ability to put any satellite into any orbit.

The current flight of GSLV III is a developmental flight. Isro is planning another developmental flight a year later. It takes at least two flawless developmental fights for the vehicle to be ready for commercial use. This year, India will put two communication satellites in orbit using the French Arianne launcher. One of these satellites will weigh 5.6 tonnes. It is beyond the capabilities of even the current GSLV III, which is now being developed to put four-tonne satellites into geostationary orbit. Later versions of the GSLV will be able to put satellites weighing up to seven to eight tonnes into geostationary orbit.

Isro had gone through a difficult period a few years ago, when a launch of its GSLV Mark II failed. This failure had its impact on GSLV Mark III as well. "Because we had problems with Mark II," says Isro chairman Kiran Kumar, "we had to rework some facilities of Mark III for Mark II. So Mark III got slightly delayed." The successful flight of GSLV Mark II in 2014 was thus a major milestone for Isro. It also qualified India's cryogenic engine, which was a reengineered version of the Russian cryogenic engines.

The cryogenic engine in Mark III is entirely designed in India, and is twice as powerful as the Mark II cryogenic engines. Isro has used a different technology for this engine called the gas-generator cycle, primarily because it gave the engineers the freedom to test each component separately. The earlier engine used a method called staged combustion, wh ere the entire engine had to be tested as one entity. "We have now made about 200 tests on the engine and its components separately," says Kiran Kumar.

For the cryogenic engine, Isro had to create new high altitude test facilities at Mahendragiri near Thiruvananthapuram. Isro tested the full engine in April 2015 for 635 seconds, and again in June 2015 for 800 seconds, well beyond the duration of its burning during a real flight. It had two more tests subsequently, one early in 2016 and another in December 2016. The performance of the new cryogenic engine would be the most crucial aspect of the flight later this month, as it is being tested for the first time in a flight. Although there are other new features in the vehicle, some of these have already been tested in a partial flight two years ago. "We had doubts about the configuration," says K Radhakrishnan, former chairman of Isro. "So we decided to have an atmospheric test flight with a passive cryogenic engine."

This flight was on December 18, 2014, when Isro tested the recovery of a crew module. Isro had doubts about the configuration because it had two boosters on either side of the liquid core stage, with the core stage not firing with the boosters. GSLV Mark II had four strap-on motors surrounding the core stage. "The aerodynamics of Mark III special because the strap-ons are in one plane," says S Somanath, former project director of GSLV Mark III and now the director of the Liquid Propulsion Systems Centre near Thiruvananthapuram. The absence of strap-ons in the other plane makes the pitching and yawing manoeuvres slightly different.

At 3.2 meter in diameter, the strap-on motors are the third largest in the world. Apart from their size, the use of two strap-on motors provided another challenge for Isro. The two motors had to match their performance precisely. If not, one would tilt the vehicle to the other side during flight. To avoid this imbalance, Isro made the boosters from one casting, by splitting it into two. It was Isro's first attempt at pair casting. It was to ensure uniformity of material and uniform degradation and it needed the development of new infrastructure.

GSLV Mark III has a core liquid stage with twin engines, another – smaller – novelty in design. The liquid engines would switch on only a 100 seconds after lift-off, but well before the strap-on motors cease firing. The launch vehicle has redundant control electronics, a requirement for any vehicle used for human flight. Isro engineers have provided Mark III with other requirements for human flight vehicle, in terms of acceleration, noise and other safety margins. Isro has already designed and test-flown a crew module.

In the end, the decision for a human flight rests with the politicians. Whether the country embarks on a human flight or not, it is necessary for Isro to design vehicles that can carry heavier and heavier payloads. Not just for communication satellites, but for future inter-planetary missions as well. The GSLV Mark III will fly this month with a 3.2-tonne satellite, the GSAT-19. The vehicle is designed to take a payload of four tonnes, but it would still not be enough for some of Isro's future requirements.

"Satellites are getting heavier and heavier," says K Sivan, director of the Vikram Sarabhai Space Centre (VSSC) in Thiruvananthapuram. "So we have to increase the capacity of the vehicle." GSLV Mark III can be tweaked to later to carry more than six tonnes of payload into a geostationary orbit, by replacing the core liquid stage with a semi-cryogenic engine. This engine is under development, and might take three to four years. After its development, India would be able to put six to seven tonne-class of satellites into a geostationary orbit, and stop using expensive overseas facilities for launching its communication satellites.
[свернуть]
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 10.05.2017 20:37:49
На форуме nsf пишут о пуске 5 июня.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 11.05.2017 11:15:33
http://timesofindia.indiatimes.com/city/thiruvananthapuram/isro-centres-turn-focus-on-launch-of-gsat-19/articleshowprint/58621659.cms
ЦитироватьIsro centres turn focus on launch of GSAT-19
TNN | May 11, 2017, 09.36 AM IST

(https://img.novosti-kosmonavtiki.ru/221357.jpg)

THIRUVANANTHAPURAM: After the successful launch of GSAT-9 on board GSLV-Mk II, scientists of ISRO centres here including Vikram Sarabhai Space Centre (VSSC) and Liquid Propulsion Systems Centre (LPSC) are back from Sriharikota. Now, the team of scientists and engineers are focussed on the next mission - GSLV-MK III, boosted with fully indigenous cryogenic engine. The GSLV-Mk III will launch the communication satellite GSAT-19 in May.

"In the previous GSLV launches, some parts of the indigenous cryogenic upper stage (CUS) engine were procured from Russia, but GSLV-Mark II had more indigenous CUS with propellant acquisition system. We used electric propulsion for the first time as part of the launch," said VSSC director K Sivan.

GSLV-Mark II was the eleventh flight of Geosynchronous Satellite Launch Vehicle (GSLV) and the fourth consecutive success achieved by GSLV carrying indigenously developed CUS, the scientists said.

"Now we are focussed on the launch of the developmental flight of GSLV-Mk III-D1 to launch the GSAT-19, a communication satellite with advanced spacecraft technologies including bus subsystem experiments in electrical propulsion System and indigenous lithium ion battery," GSLV Mk III project director G Ayyappan said. This GSLV-MK III rocket with totally indigenous CUS will weigh about 3.5 tons as against the GSLV-MK II vehicle with indigenous CUS stage weighing 2.2 tons, he said.

LPSC director S Somnath had earlier said that the GSLV-Mk III is set to launch the communication satellite GSAT-19 by May end and then Earth observation satellite Cartosat-2E will be launched via PSLV-C38 by June first week.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 12.05.2017 07:33:42
ЦитироватьGSAT-19 Spacecraft was flagged off from ISRO Satellite Centre to SDSC-SHAR launch pad on 1st May 2017
http://www.isac.gov.in/flagoff-GSAT-19.jsp
(https://forum.novosti-kosmonavtiki.ru/forum/file/70782)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 12.05.2017 15:36:25
(https://forum.novosti-kosmonavtiki.ru/forum/file/70799)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 12.05.2017 15:38:29
ISRO to launch GSLV Mark III-D1 on June 5 with 4-tonne payload (http://www.thehindubusinessline.com/news/isro-to-launch-gslv-mark-iiid1-on-june-5-with-4tonne-payload/article9695152.ece)

ЦитироватьHYDERABAD, MAY 12:  In yet another major step towards being self reliant in the country's space programme and tap into opportunities in the global marketplace, the Indian Space Research Organisation will launch GSLV Mark III-D1 with a payload of four tonnes on June 5.

"As on today, ISRO has the capability to launch payloads of up to 2.2 tonnes and anything above that it had to tap Ariane or other launch facilities. This will be a significant move from us," the ISRO Chairman and Secretary, Department of Space, AS Kumar, said.

The Geosynchronous Satellite Launch Vehicle Mark III is a gamechanger capable of launching 4-tonne category of satellites from Sriharikota. It packs an Indian cryogenic third stage and higher payload as against the current GSLV.

Apart from deploying advanced spacecraft technologies, the satellite would carry ka and ku-band payload along with a Geostationary Radiation Spectrometer that will help research space radiation.

Спойлер
Outreach

The Space Secretary said that ISRO will soon launch an innovative Outreach centre in Hyderabad, which would serve as a hub/centre for research, and base for start-ups and entrepreneurs to explore new business opportunities.

The huge amount of data collected by various space missions, and its learnings would be made accessible to people. This centre is expected to come up near Jeedimatla in the city limits.

In a boost to the country's quest to drive electric vehicles, ISRO has outlined plans to share its learnings and expertise in lithium ion battery technologies for commercial use.

Kiran Kumar said, "Over the years, ISRO has developed a number of technologies towards indigenisation and self reliance, and the capability of developing efficient lithium ion batteries is one such area which we can share for further development."

"We have developed technologies which help batteries run for up to 10-12 years and even more. This learning can be shared with entrepreneurs for commercialisation and come out with cost effective batteries for use in electric vehicles and other applications." he said.

Speaking at the Indian Institute of Chemical Technology, the ISRO chief said: "ISRO handled more than 151 missions that have been completed. These include 88 satellite programmes and 59 satellite launch vehicles."

"The launch of 104 satellites on a single mission earlier this year demonstrated our space technology capability," he said.

Referring to ISRO contributions, he said that the technologies developed and data available through various satellites it has launched is being used for applications in agriculture, weather forecasting and in tele-medicine. Efforts are on to see if a Postman could serve as a link between farmers and government, he said.
[свернуть]
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 14.05.2017 20:30:24
http://epaperbeta.timesofindia.com/Article.aspx?eid=31804&articlexml=GSLV-Mark-3-to-lift-off-on-June-14052017014042# (http://epaperbeta.timesofindia.com/Article.aspx?eid=31804&articlexml=GSLV-Mark-3-to-lift-off-on-June-14052017014042#)
ЦитироватьMay 14 2017 : The Times of India (Mumbai)

GSLV Mark-3 to lift off on June 5

 TNN

The much-awaited launch of the GSLV Mark-3 rocket, carrying the nearly three-tonne Gsat-19 satellite, is scheduled for June 5 at 4.30pm in Sriharikota, Isro officials said on Friday. This will be the first developmental flight of the rocket. The experimental flight was on December 14, 2014.According to Isro, Gsat-19 will employ advanced spacecraft technologies.
https://img.novosti-kosmonavtiki.ru/330617.jpg
(https://img.novosti-kosmonavtiki.ru/330617.jpg)
Предварительно:
2017-06-05 16:30 IST --> 11:00 UTC (14:00 ДМВ)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 19.05.2017 16:37:07
Цитировать"Preparations are going on in full swing...And right now, the cryogenic stage (is) also integrated with the vehicle. The satellite is also getting prepared," Vikram Sarabhai Space Centre (VSSC) Director K Sivan told reporters here on the sidelines of a function.

"Maybe in a week's time, we will be able to assemble the satellite along with the vehicle. We are targeting the launch in the first week of June," he said.

However, Sivan said the exact date for the launch of GSLV Mark III is yet to be finalised.
http://www.outlookindia.com/newsscroll/all-set-for-gslv-mark-iii-launch/1055080
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 26.05.2017 12:30:59
http://www.sakshi.com/news/national/gslv-mark-3-experiment-on-june-5-478947
Цитироватьజూన్‌ 5న జీఎస్‌ఎల్‌వీ మార్క్‌–3 ప్రయోగం
 
Sakshi (http://www.sakshi.com/topic/sakshi) | Updated: May 26, 2017 02:26 (IST)

శ్రీహరికోట (సూళ్లూరుపేట): జీఎస్‌ఎల్‌వీ మార్క్‌–3 ప్రయోగానికి అన్ని ఏర్పాట్లు జరుగుతున్నాయి. వచ్చే నెల ఐదున శ్రీపొట్టిశ్రీరాములు నెల్లూరు జిల్లాకు చెందిన శ్రీహరికోటలోని భారత అంతరిక్ష ప్రయోగ కేంద్రమైన సతీష్‌ధావన్‌ స్పేస్‌ సెంటర్‌ (షార్‌) నుంచి దీన్ని ఇస్రో ప్రయోగించనుంది. ఈ నేపథ్యంలో షార్‌లోని రెండో ప్రయోగ వేదికకు అనుసంధానంగా ఉన్న సాలిడ్‌ స్టేజ్‌ అసెంబ్లింగ్‌ బిల్డింగ్‌ (ఎస్‌ఎస్‌ఏబీ) మూడు దశల రాకెట్‌ అనుసంధానాన్ని బుధవారం పూర్తి చేశారు. ఎస్‌ఎస్‌ఏబీ నుంచి రాకెట్‌ను ప్రయోగవేదిక మీద అనుసంధానం చేసేందుకు వెహి కల్‌ మూమెంట్‌ కార్యక్రమాన్ని ఈ నెల 27న చేపట్టనున్నారు.

 ఈ రాకెట్‌ ద్వారా 4.5 టన్నుల బరువు కలిగిన జీశాట్‌–19ను రోదసీలోకి పంపనున్నారు. ఇదిలా ఉండగా షార్‌లోని మొదటి ప్రయోగ వేదిక నుంచి పీఎస్‌ఎల్‌వీ సీ–38ను జూన్‌ 23న ప్రయోగించేందుకు ఇస్రో నిర్ణయం తీసుకుంది. దీనికి సంబంధించి పీఎస్‌ఎల్‌వీ రాకెట్‌లోని రెండో దశను అనుసంధానం చేసే ప్రక్రియను గురువారం పూర్తి చేశా రు. కాగా, జీఎస్‌ఎల్‌వీ మార్క్‌–3 ప్రయోగం జూన్‌ 5న ముగియగానే ఎస్‌ఎస్‌ఏ బీలో పీఎస్‌ఎల్‌వీ సీ–39 రాకెట్‌ క్యాంపైన్‌ను ప్రారంభించేందుకు సన్నాహాలు చేస్తు న్నారు. తద్వారా జూన్‌లో ఇస్రో శాస్త్రవేత్తలు 3 ప్రయోగాలకు సిద్ధమవుతున్నారు.
ЦитироватьGSLV Mark-3 launch on June 5

Preparations for GSLV-MKIII launch are in full swing. This launch is going to take place from SDSC, SHAR in Nellore District.On Wednesday, the integration of all the three stages was completed at the Solid Stage Assembly Building connected to the 2nd launch pad. On 27th of this month, they are planning to move the vehicle to the launch pad.

Through this rocket, GSAT-19 spacecraft weight 4.5 tonnes is going to be placed in orbit. In the mean while, ISRO has decided to launch PSLV-C38 on June-23rd from the first launch pad. As part of this,the integration of PSLV's second stage was completed On Thursday. Add of this, just after the completion of GSLv-MKIII launch on June-5, the integration of PSLV-C39 is to be started in SSAB. With this, ISRO plans to complete 3 launches in June.
ЦитироватьЗапуск GSLV Mark-3 5 июня

Подготовка к запуску GSLV-MKIII идет полным ходом. Этот запуск будет проходить из SDSC, SHAR в районе Неллоре. В среду интеграция всех трех этапов была завершена в SSAB, соединенном со второй стартовой площадкой. 27-го числа этого месяца они планируют переместить носитель на стартовую площадку.

С помощью этой ракеты на орбиту выведут космический аппарат GSAT-19, весящий 4,5 тонны. Тем временем ISRO решил запустить PSLV-C38 23 июня с первой стартовой площадки. В рамках этого, интеграция второго этапа PSLV была завершена в четверг. Добавьте это, сразу после завершения запуска GSLv-MKIII 5 июня, интеграция PSLV-C39 должна быть запущена в SSAB. Таким образом, ISRO планирует завершить 3 запуска в июне.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 26.05.2017 22:05:13
ЦитироватьA1058/17 (Issued for VOMF PART 1 OF 2) - E) GSLV-MKIII-D1 ROCKET LAUNCH FROM SHAR RANGE, SRIHARIKOTA WILL TAKE PLACE AS PER FLW DETAILS.
THE LAUNCH WILL BE ON ANY ONE OF THE DAY DRG THIS PERIOD.
ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24HR IN ADVANCE THROUGH A SEPERATE NOTAM.
LAUNCH PAD COORD: 134312.00N 0801348.00E
NO FLT IS PERMITTED OVER THE DNG ZONE.

Спойлер
A. DNG ZONE -1 IS A CIRCLE OF 10NM AROUND THE LAUNCHER
B. DNG ZONE -2 IS A RECTANGULAR AREA BOUNDED BY: 1230N 08240E 1315N 08250E 1245N 08410E 1200N 08400E
C. DNG ZONE -3 IS A RECTANGULAR AREA BOUNDED BY: 1130N 08515E 1220N 08525E 1155N 08645E 1105N 08635E
D. DNG ZONE -4 IS A RECTANGULAR AREA BOUNDED BY: 0810N 09420E 0900N 09440E 0825N 09615E 0735N 09555E
 
ROUTES AFFECTED IN CHENNAI FIR ARE: N571, P761 ,W20, A465, L510, P628, L645, Q10, Q11, Q23, Q24, V3, V4,V6,V8 V9 AND V11
 
CLOSURE/ALTN ROUTINGS:
1) N571 NOT AVBL BTN DORAM AND BIKEN ALTN RTE: DORAM-DCT-MMV VOR-DCT GIRNA-DCT BIKEN-N571 (BIDIRECTIONAL)
2) P761 NOT AVBL MMV VOR AND PPB VOR ALTN RTE: MMV VOR-DCT-GIRNA-DCT-BIKEN-DCT- PPB VOR (BIDIRECTIONAL)
3) W20 NOT AVBL BTN MMV VOR AND BODEL ALTN RTE: MMV VOR-TR319/139DEG- 53NM-TTP VOR TR357/177DEG - 81NM-BODEL (BIDIRECTIONAL)

END PART 1 OF 2. BTN 1130-1530, 05 JUN 11:30 2017 UNTIL 28 JUN 15:30 2017. CREATED: 26 MAY 15:49 2017

A1058/17 (Issued for VOMF PART 2 OF 2)
4) A465 NOT AVBL BTN MMV VOR AND DOKET ALTN RTE: MMV VOR-TR319/139DEG- DIST 53NM- TTP VOR -TR034/214DEG- DIST 53NM- POINT A (142225N 0800303E) -TR055/235DEG -126NM- DOKET- A465 (BIDIRECTIONAL)
5) ATS RTE Q23 BTN ISPUL AND MMV VOR NOT AVBL ALTN RTE: ISPUL -DCT- TTP VOR- DCT- MMV VOR
6) ATS RTE Q24 BTN MMV VOR AND BODEL NOT AVBL ALTN RTE: MMV VOR - DCT - TTP VOR-DCT-BODEL
7) ATS RTE L510 NOT AVBL BTN BIDEX AND EMRAN (DUE DNG ZONE -4)
8)  ATS RTE P628 NOT AVBL BTN IGREX AND VATLA (DUE DNG ZONE -4)
9) ATS ROUTE L645 NOT AVBL BTN SULTO AND SAMAK (DUE DNG ZONE -4)
10) ATS ROUTES Q10, Q11, V3, V4, V6,V8, V9, V11 NOT AVBL.
11) CTC NR OF WATCH SUPERVISORY OFFICER, CHENNAI (NODAL COORDINATOR) 00-91-4422560894/00-91-9840987941/00870762092877. GND - UNL)
[свернуть]
END PART 2 OF 2, BTN 1130-1530, 05 JUN 11:30 2017 UNTIL 28 JUN 15:30 2017. CREATED: 26 MAY 15:49 2017
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 26.05.2017 22:47:45
Цитироватьche wi (http://novosti-kosmonavtiki.ru/forum/user/26796/) пишет:
A1058/17
DNG ZONES B, C, D (https://forum.novosti-kosmonavtiki.ru/forum/file/71206)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 28.05.2017 06:31:19
http://www.andhrajyothy.com/artical?SID=419510
Цитировать...
జూన 5న సాయంత్రం 5.28 గంటలకు పొట్టి శ్రీరాములు నెల్లూరుజిల్లా శ్రీహరికోటలోని షార్‌ కేంద్రం నుంచి ఈ రాకెట్‌ను ప్రయోగించేందుకు ఇస్రో సన్నాహాలు చేస్తోంది.
...
ప్రయోగ వేదికపైకి రాకెట్‌
జీఎస్‌ఎల్వీ-మార్క్‌3 రాకెట్‌ను శనివారం ఉదయం 6 గంటలకు షార్‌లోని రెండో ప్రయోగ వేదికపైకి తరలించి ఉబ్లికల్‌ టవర్‌ (యూటీ)కి చేరవేశారు. పీఎస్‌ఎల్వీ, జీఎస్‌ఎల్వీ రాకెట్‌లు ప్రయోగవేదికపైకి చేరిన తదుపరి 9 రోజుల పాటు వివిధ పరీక్షలు నిర్వహించేవారు. ప్రస్తుతం జీఎస్‌ఎల్వీ-మార్క్‌3 కొత్తతరహా రాకెట్‌ కావడంతో 10 రోజులపాటు వివిధ పరీక్షలు నిర్వహించాలని శాస్త్రవేత్తలు నిర్ణయించారు.
Цитировать...
ISRO is planning to launch the racket from SHAR Center in Sriharikota at 5.28 pm on June 5.
...
Rocket on the launch pad
The GSLV-Mark3 rocket was shifted to the Second Launch Pad at SHAR on Saturday morning at 6 am to the Umbilical Tower. The next 9 days of the launch of GSLV rocket will go through a series of checks. Scientists have decided to conduct various tests for 10 days with the current GSLV-Mark3 new rocket.
Цитировать...
ISRO планирует запустить ракету из центра SHAR в Шрихарикоте 5 июня в 5:28 вечера.
...
Ракета на стартовой площадке
Ракета GSLV-Mark3 была перенесена на вторую стартовую площадку в субботу в 6 часов утра в Umbilical Tower. Следующие 9 дней до запуска ракета GSLV пройдёт серию проверок. Ученые решили провести различные испытания в течение 10 дней с использованием новой ракеты GSLV-Mark3.
На текущий момент пуск 2017-06-05 в 17:28 IST --> 11:58 UTC (14:58 ДМВ)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 29.05.2017 09:07:16
Цитировать (https://img.novosti-kosmonavtiki.ru/185687.png) NewSpace India‏ @NewSpaceIndia (https://twitter.com/NewSpaceIndia) 7 ч. назад (https://twitter.com/NewSpaceIndia/status/868972695609671681)

June 5 launch of 'fat boy' to pave way for manned mission - Times of India http://dlvr.it/PGGmmF  (https://t.co/ZhHJ5VpTde)
(https://img.novosti-kosmonavtiki.ru/162416.jpg)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 29.05.2017 19:10:05
(https://forum.novosti-kosmonavtiki.ru/forum/file/71257) (https://forum.novosti-kosmonavtiki.ru/forum/file/71258) (https://forum.novosti-kosmonavtiki.ru/forum/file/71259)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 29.05.2017 19:14:45
(https://forum.novosti-kosmonavtiki.ru/forum/file/71260) (https://forum.novosti-kosmonavtiki.ru/forum/file/71261) (https://forum.novosti-kosmonavtiki.ru/forum/file/71262)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 29.05.2017 19:18:33
(https://forum.novosti-kosmonavtiki.ru/forum/file/71263) (https://forum.novosti-kosmonavtiki.ru/forum/file/71264) (https://forum.novosti-kosmonavtiki.ru/forum/file/71265)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 29.05.2017 19:23:15
(https://forum.novosti-kosmonavtiki.ru/forum/file/71266) (https://forum.novosti-kosmonavtiki.ru/forum/file/71267) (https://forum.novosti-kosmonavtiki.ru/forum/file/71268)

http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-gallery
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 29.05.2017 19:27:20
http://isro.gov.in/update/29-may-2017/gslv-mk-iii-d1-gsat-19-mission-scheduled-to-be-launched-june-05-2017-1728-hrs-ist
ЦитироватьMay 29, 2017

GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from SDSC SHAR, Sriharikota
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 29.05.2017 19:33:24
Обновлена страница миссии
http://isro.gov.in/launcher/gslv-mk-iii-d1-gsat-19-mission
Цитировать
GSLV Mk III-D1/GSAT-19 Mission
GSLV Mk III-D1
GSLV-Mk III is capable launching 4 ton class of satellites to Geosynchronous Transfer orbit (GTO). It is a three-stage vehicle with two solid motor strap-ons (S200), a liquid propellant core stage (L110) and a cryogenic stage (C25).

GSLV-Mk III-D1 is the first developmental flight, carrying 3136 kg GSAT-19 satellite to a Geosynchronous Transfer Orbit (GTO). The vehicle is configured with a 5 m ogive payload fairing and slanted strap-on nose cone to provide aerodynamic robustness.

GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from the Second Launch Pad at SDSC SHAR, Sriharikota


 GSLV Mk III-D1/GSAT-19 Mission
 
    [/li]
  • GSAT-19 (http://isro.gov.in/Spacecraft/gsat-19)
  • GSLV Mk III-D1/GSAT-19 Mission Gallery (http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-gallery)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 29.05.2017 19:36:29
http://isro.gov.in/Spacecraft/gsat-19
Цитировать
GSAT-19
GSAT-19 satellite with a lift-off mass of 3136 kg, is the communication satellite of India, configured around the ISRO's standard I-3K bus.

GSAT-19 carries Ka/Ku-band high throughput communication transponders. Besides, it carries a Geostationary Radiation Spectrometer (GRASP) payload to monitor and study the nature of charged particles and the influence of space radiation on satellites and their electronic components. GSAT-19 also features certain advanced spacecraft technologies including miniaturised heat pipe, fibre optic gyro, Micro Electro-Mechanical Systems (MEMS) accelerometer, Ku-band TTC transponder, as well an indigenous Lithium-ion Battery.

GSLV Mk III-D1/GSAT-19 Mission is scheduled to be launched on June 05, 2017 at 17:28 Hrs (IST) from the Second Launch Pad at SDSC SHAR, Sriharikota
 
Type of Satellite: 
Communication

Manufacturer: 
ISRO

Owner: 
ISRO
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 03.06.2017 14:53:11
https://img.novosti-kosmonavtiki.ru/230429.png
(https://img.novosti-kosmonavtiki.ru/230429.png)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 03.06.2017 14:55:56
GSLV Mk III-D1/GSAT-19 Mission Curtain Raiser Video(English)

http://www.isro.gov.in/sites/default/files/videos/gslv-mk-iii-d1-gsat19-with-logo.mp4
http://www.isro.gov.in/sites/default/files/videos/gslv-mk-iii-d1-gsat19-with-logo.mp4 (http://www.isro.gov.in/sites/default/files/videos/gslv-mk-iii-d1-gsat19-with-logo.mp4) (11:00)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 03.06.2017 15:05:17
GSLV Mark III-D1 / GSAT-19 Brochure GSLV Mark III D1.pdf (http://www.isro.gov.in/sites/default/files/flipping_book/GSLV%20Mark%20III%20D1/files/assets/common/downloads/GSLV%20Mark%20III%20D1.pdf) - 2673591 B, 2017-06-02 04:23:45 UTC, 8 стр
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71497)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 03.06.2017 15:22:56
(https://forum.novosti-kosmonavtiki.ru/forum/file/71498)
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71499)
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71500)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 03.06.2017 15:35:28
http://www.isro.gov.in/update/02-jun-2017/mission-readiness-review-mrr-committee-and-launch-authorisation-board-lab-have
ЦитироватьJun 02, 2017

Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 25 and half hr countdown of GSLV MkIII D1 / GSAT-19 mission for Sunday, June 04, 2017 starting at 15:58 hr IST
And launch of GSLV MkIII D1 /  GSAT-19 mission for Monday, June 05, 2017 at 17:28 ht IST
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 02:17:19
ЦитироватьISRO - GSLV mk 3 Official Documentary [ EXPLAINED ] 2017
https://www.youtube.com/watch?v=L4--dAAgc9A
https://www.youtube.com/watch?v=L4--dAAgc9A (https://www.youtube.com/watch?v=L4--dAAgc9A) (10:28 )
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 06:54:44
http://www.isro.gov.in/update/04-jun-2017/25-and-half-hr-countdown-operations-of-gslv-mk-iii-d1-gsat-19-mission-started
ЦитироватьJun 04, 2017

The 25 and half hr countdown operations of GSLV Mk III D1 / GSAT-19 mission started today, Sunday, June 04, 2017 at 15:58 hr IST
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 06:56:38
http://www.isro.gov.in/update/04-jun-2017/propellant-filling-operations-of-l110-second-stage-of-gslv-mk-iii-d1-are-under
ЦитироватьJun 04, 2017

Propellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are under progress. Countdown is progressing normally.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 07:03:07
http://www.isro.gov.in/update/05-jun-2017/propellant-filling-operations-of-l110-second-stage-of-gslv-mk-iii-d1-are
ЦитироватьJun 05, 2017

Propellant filling operations of L110 (Second Stage) of GSLV Mk III D1 are completed
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 07:26:54
https://www.nasaspaceflight.com/2017/06/glsv-mark-iii-rocket-launch-gsat-19-satellite/
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 07:57:36
ЦитироватьISRO set to launch GSLV Mark 111D -1

 (https://img.novosti-kosmonavtiki.ru/220755.jpg)  (https://www.youtube.com/user/DDNewsofficial) DD News (https://www.youtube.com/channel/UCKwucPzHZ7zCUIf7If-Wo1g)
https://www.youtube.com/watch?v=5Mw4NljsyyA
https://www.youtube.com/watch?v=5Mw4NljsyyA (https://www.youtube.com/watch?v=5Mw4NljsyyA) (1:51)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: vogel от 05.06.2017 10:32:01
Трансляция на YouTube: https://www.youtube.com/watch?v=ae6LVG0j1Pg
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 05.06.2017 11:09:52
(https://forum.novosti-kosmonavtiki.ru/forum/file/71592)

http://isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-gallery
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 11:13:52
Ещё трансляции на ТыТрубе
 - https://www.youtube.com/watch?v=bRjcRitEuiE

 - https://www.youtube.com/watch?v=dVl-u5omuRM

- https://www.youtube.com/watch?v=z0CzoWuWVsM
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Чебурашка от 05.06.2017 11:18:59
Что-то для 640-тонной ракеты да ещё и с водородным РБ стратующей почти с экватора - 4 тонны на ГПО маловато будет  :?:
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 12:19:44
Ещё от ISRO (запасной вариант):

ISRO live stream - http://cdn.24fd.com/events/isro/050617/gsat19/index.html
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Apollo13 от 05.06.2017 12:50:30
ЦитироватьЧебурашка пишет:
Что-то для 640-тонной ракеты да ещё и с водородным РБ стратующей почти с экватора - 4 тонны на ГПО маловато будет  :?:
ТТУ, вонючка.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:15:42
http://www.isro.gov.in/update/05-jun-2017/gslv-mk-iii-d1-gsat-19-propellant-filling-operations-of-cryo-stage-are-completed
ЦитироватьJun 05, 2017

GSLV Mk III-D1/GSAT-19: Propellant filling operations of cryo stage are completed
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:18:11
(https://forum.novosti-kosmonavtiki.ru/forum/file/71593)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:29:03
В эфире - PTI News Corporation - https://www.youtube.com/watch?v=z0CzoWuWVsM
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Чебурашка от 05.06.2017 14:32:18
Ну теперь хоть ускорители отключаются до центрального блока - как у нормальных ракет.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:33:21
(https://forum.novosti-kosmonavtiki.ru/forum/file/71594)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:34:37
Цитировать06/05/2017 14:29 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742334?url=https://v.24liveblog.com/live/?id=1392760)
The launch team reports ground and upper level winds are benign and acceptable for liftoff.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:39:02
Запасной канал ISRO в эфире
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71595)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:46:17
DD National live в эфире - https://www.youtube.com/watch?v=URoXGp-8e-4
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71596)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:47:53
Цитировать06/05/2017 14:41 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742380?url=https://v.24liveblog.com/live/?id=1392760)
All launch vehicle and range systems are reported ready for liftoff.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:51:50
Цитировать06/05/2017 14:47 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742398?url=https://v.24liveblog.com/live/?id=1392760)
T-minus 11 minutes and counting. The GSLV Mk.3 flew on a suborbital test flight in December 2014, testing its S200 solid rocket boosters and the L110 core stage powered by two hydrazine-fueled Vikas engines.

The CE-20 engine on the cryogenic upper stage was not operational on that mission.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:53:08
(https://forum.novosti-kosmonavtiki.ru/forum/file/71597)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 14:57:02
Цитировать06/05/2017 14:55 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742418?url=https://v.24liveblog.com/live/?id=1392760)
T-minus 3 minutes. The GSLV Mk.3's on-board computers are reported to be in flight mode.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 05.06.2017 14:58:11
- 1 мин.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:11:11
Цитировать06/05/2017 14:57 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742465?url=https://v.24liveblog.com/live/?id=1392760)
T-minus 1 minute and counting. The S200 solid rocket booster will ignite at T-0.

06/05/2017 14:59 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742465?url=https://v.24liveblog.com/live/?id=1392760)
Liftoff of India's GSLV Mk.3 on its first orbital test flight.

06/05/2017 15:02 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742465?url=https://v.24liveblog.com/live/?id=1392760)
The GSLV's L110 liquid-fueled core, powered by two Vikas engines, has ignited and is performing normally. The two strap-on boosters have burned out and jettisoned.

06/05/2017 15:02 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742465?url=https://v.24liveblog.com/live/?id=1392760)
T+plus 5 minutes. The GSLV Mk.3's payload fairing has jettisoned now that the rocket has reached space.

06/05/2017 15:05 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742465?url=https://v.24liveblog.com/live/?id=1392760)
ISRO confirms ignition of the CE-20 upper stage engine after the GSLV Mk.3's core stage shut down and jettisoned.

06/05/2017 15:07 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742465?url=https://v.24liveblog.com/live/?id=1392760)
T+plus 8 minutes. The CE-20 engine generates 44,000 pounds of thrust in vacuum. The engine is programmed to burn until T+plus 16 minutes, 5 seconds, to inject the GSAT 19 communications satellite into geostationary transfer orbit.

06/05/2017 15:07 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742473?url=https://v.24liveblog.com/live/?id=1392760)
T+plus 8 minutes, 45 seconds. The GSLV Mk.3 is now 1,360 kilometers downrange from Sriharikota.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:12:49
(https://forum.novosti-kosmonavtiki.ru/forum/file/71598)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:13:22
Цитировать06/05/2017 15:12 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742489?url=https://v.24liveblog.com/live/?id=1392760)
T+plus 13 minutes, 30 seconds. The performance of the GSLV Mk.3's cryogenic upper stage is reported normal. Velocity is 7.6 kilometers per second.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:14:11
(https://forum.novosti-kosmonavtiki.ru/forum/file/71599)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 05.06.2017 15:16:06
Отделение КА.
Аплодисменты.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:16:37
(https://forum.novosti-kosmonavtiki.ru/forum/file/71600)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:17:18
Цитировать06/05/2017 15:15  GSAT 19 separation (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742499?url=https://v.24liveblog.com/live/?id=1392760)
GSAT 19 separation! ISRO launch control confirms shutdown of the CE-20 upper stage engine and separation of the GSAT 19 satellite in orbit.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:21:57
Цитировать06/05/2017 15:15 (https://img.novosti-kosmonavtiki.ru/196244.png)  (http://24liveblog.com/share/196742500?url=https://v.24liveblog.com/live/?id=1392760)
The geostationary transfer orbit achieved on today's flight appears very close to pre-flight predictions.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Чебурашка от 05.06.2017 15:23:37
Можно поздравить Индию с собственной ракетой тяжёлого класса.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: triage от 05.06.2017 15:25:01
оперативно от ТАСС
Цитировать http://tass.ru/kosmos/4314078
НЬЮ-ДЕЛИ, 5 июня. /Корр. ТАСС Евгения Кармалито/. Крупнейшая в Индии ракета-носитель собственной разработки GSLV Mark III (LVM3), способная вывести на орбиту полезный груз весом до 4 тонн, впервые успешно запущена в космос. Об этом сообщила Индийская организация космических исследований (ISRO).
"Запуск ракеты GSLV Mark III с криогенным двигателем, которая вывела на орбиту спутник связи GSAT-19 весом 3336 кг, состоялся на территории Космического центра имени Сатиша Дхавана на острове Шрихарикота в штате Андхра-Прадеш в 17:28 по местному времени (14:58 мск), - заявил глава ISRO Киран Кумар. - Это большой рывок для нашей космической отрасли: до сих пор полезная нагрузка ограничивалась 2,2 тонны. До конца текущего года мы проведем еще один испытательный запуск GSLV-Mk III-D1, еще более увеличив нагрузку".

По его словам, новая ракета позволит в перспективе полностью отказаться от услуг других государств при запуске крупных индийских спутников. "Новая индийская ракета-носитель со стартовой массой 640 тонн теперь регулярно будет выводить на орбиту аппараты весом в 4 тонны, - подчеркнул глава ISRO. - Более того, с таким носителем Индия может рассчитывать на большую долю на рынке международных космических запусков, который составляет $300 млрд в год".

Кроме того, GSLV-Mk III-D1 позволит Индии воплотить давнюю мечту о создании собственной орбитальной станции. "Теперь у нас есть все возможности для создания космической станции, надо лишь определить сроки и получить финансирование", - заявил Киран Кумар. По его словам, Индия до сих пор не приступила к пилотируемым полетам в космос только потому, что у страны не было ракет-носителей с достаточной грузоподъемностью, "но теперь этот вопрос практически решен, теперь при условии одобрения программы правительством на отправку человека в космос потребуется всего семь лет".
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:25:58
ЦитироватьGSLV Mk III-D1 first orbital launch with GSAT-19, 5 June 2017
 
  (https://img.novosti-kosmonavtiki.ru/220782.jpg)  (https://www.youtube.com/user/SciNewsRo)
 SciNews (https://www.youtube.com/channel/UCjU6ZwoTQtKWfz1urL7XcbA)
https://www.youtube.com/watch?v=LuQfoO_yHlM
https://www.youtube.com/watch?v=LuQfoO_yHlM (https://www.youtube.com/watch?v=LuQfoO_yHlM) (3:39)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Чебурашка от 05.06.2017 15:27:58
Странно, что центральный блок такой короткий. 
Его можно раза в два удлинить увеличив запас топлива.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:28:15
http://www.isro.gov.in/update/05-jun-2017/gslv-mk-iii-d1-successfully-launches-gsat-19
ЦитироватьJun 05, 2017

GSLV Mk III-D1 Successfully launches GSAT-19
[/COLOR]
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 15:33:45
ЦитироватьGSLV Mk III D1 / GSAT - 19 Live Streaming

 (https://img.novosti-kosmonavtiki.ru/220683.jpg)  (https://www.youtube.com/user/teletechnology) teletechnology (https://www.youtube.com/channel/UC8GuEY8ixapJ3ZzX5CMzoDg)
https://www.youtube.com/watch?v=Um4FcalmyoA
https://www.youtube.com/watch?v=Um4FcalmyoA (https://www.youtube.com/watch?v=Um4FcalmyoA) (25:07)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 16:25:27
ЦитироватьТрансляция пуска GSLV Mark III (GSAT-19)
 
  (https://img.novosti-kosmonavtiki.ru/220660.jpg) (https://www.youtube.com/user/threedaysfaq) Alpha Centauri (https://www.youtube.com/channel/UC-yTIuKauNecL0Tl6ChD0yw)
https://www.youtube.com/watch?v=xP21ezzXxq0
https://www.youtube.com/watch?v=xP21ezzXxq0 (https://www.youtube.com/watch?v=xP21ezzXxq0) (50:48 )
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 16:37:19
ЦитироватьThe Launch of GSLV Mk III-D1 / GSAT-19 mission

 (https://img.novosti-kosmonavtiki.ru/220738.jpg)  (https://www.youtube.com/user/DoordarshanNational) DoordarshanNational (https://www.youtube.com/channel/UCSjPe5kinQtwcyHcFJyyMfw)
https://www.youtube.com/watch?v=ae6LVG0j1Pg
https://www.youtube.com/watch?v=ae6LVG0j1Pg (https://www.youtube.com/watch?v=ae6LVG0j1Pg) (50:15)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 17:18:00
Цитировать (https://pbs.twimg.com/profile_images/866278093828247556/p9zmSlji_bigger.jpg) Rachana‏ @rachanareddym (https://twitter.com/rachanareddym) 47 мин назад (https://twitter.com/rachanareddym/status/871720634425921536)

Beautiful click of GSLV Mk III D-1 today's launch by @HemanPhinehas (https://twitter.com/HemanPhinehas) #isro (https://twitter.com/hashtag/isro?src=hash) #GSAT19 (https://twitter.com/hashtag/GSAT19?src=hash)
(https://img.novosti-kosmonavtiki.ru/162932.jpg)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 17:26:37
:D  - тоже участник запуска
https://forum.nasaspaceflight.com/index.php?action=dlattach;topic=40777.0;attach=1431278;sess=0
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71641)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 17:27:52
Цитировать (https://img.novosti-kosmonavtiki.ru/69464.jpg) ISRO‏Подлинная учетная запись @isro (https://twitter.com/isro) 6 мин. назад (https://twitter.com/isro/status/871733569672097792)

GSLV Mk III-D1/GSAT-19 Mission Gallery http://www.isro.gov.in/gslv-mk-iii-d1-gsat-19-mission/gslv-mk-iii-d1-gsat-19-mission-gallery ... (https://t.co/Svnu5Qan4l)
(https://img.novosti-kosmonavtiki.ru/162979.jpg)
(https://img.novosti-kosmonavtiki.ru/162978.jpg)
(https://img.novosti-kosmonavtiki.ru/162977.jpg)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 17:45:58
http://www.isro.gov.in/update/05-jun-2017/first-developmental-flight-of-indias-gslv-mkiii-successfully-launches-gsat-19
ЦитироватьJun 05, 2017

First Developmental Flight of India's GSLV MkIII Successfully launches GSAT-19 Satellite
The first developmental flight (GSLV MkIII-D1) of India's heavy lift launch vehicle GSLV Mk-III was successfully conducted today (June 05, 2017) evening from Satish Dhawan Space Centre SHAR, Sriharikota with the launch of GSAT-19 satellite. This was the first orbital mission of GSLV MkIII which was mainly intended to evaluate the vehicle performance including that of its fully indigenous cryogenic upper stage during the flight.  Weighing 3136 kg at lift-off, GSAT-19 is the heaviest satellite launched from the Indian soil.

After a twenty five and a half hour smooth countdown, the mission began with the launch of the 640 ton GSLV Mk-III at 5:28 pm IST from the Second Launch Pad as scheduled with the ignition of its two S200 solid strap-on boosters.Following this, the major phases of the flight occurred as scheduled.  The upper stage of GSLV MkIII vehicle is a new cryogenic stage (C25) indigenously configured, designed and realised by ISRO. The cryogenic stage used liquid Hydrogen and liquid Oxygen as propellants with a total loading of 28 tons. The stage is powered by a 20 ton thrust cryogenic engine (CE20) operating on 'gas generator cycle'. The performance of the engine and stage during the mission was as predicted.  About sixteen minutes after lift-off, GSAT-19 satellite was successfully placed in orbit.

Soon after its separation from GSLV, the Master Control Facility (MCF) at Hassan in Karnataka assumed control of the satellite.   GSAT-19 is a high throughput communication satellite.

In the coming days, GSAT-19 orbit will be raised from its present Geosynchronous Transfer Orbit (GTO) to the final circular Geostationary Orbit (GSO) by firing the satellite's Liquid Apogee Motor (LAM) in stages.  During the final phase of this operation, the solar panels and antenna reflectors of the satellite will be deployed. The satellite will be commissioned into service after its positioning in the designated slot in the GSO following in-orbit testing of its payloads.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 17:47:43
Цитировать (https://img.novosti-kosmonavtiki.ru/185988.jpg) Peter B. de Selding‏ @pbdes (https://twitter.com/pbdes) 2 ч. назад (https://twitter.com/pbdes/status/871707140263751680)

India's @isro (https://twitter.com/isro): 'In a couple of yrs, when GSLV is fully operational, we'll attract US-built sats. India can do it more economically.'
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 18:20:57
ЦитироватьGSLV MK3 -(Fat boy / Bahubali)- successful launch from Sriharikota on 5th June 2017
https://www.youtube.com/watch?v=kUgvQYZBhoU
https://www.youtube.com/watch?v=kUgvQYZBhoU (https://www.youtube.com/watch?v=kUgvQYZBhoU) (2:56)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 05.06.2017 20:54:51
Любительское видео из Ченнаи - отделение боковушек S200
https://www.youtube.com/watch?v=1L0wPmn0K2U
https://www.youtube.com/watch?v=1L0wPmn0K2U (https://www.youtube.com/watch?v=1L0wPmn0K2U) (2:20)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 06.06.2017 17:51:36
ЦитироватьGSLV Mk III D1 / GSAT-19 Tracking and Onboard Camera Video
http://www.isro.gov.in/sites/default/files/videos/gsat_19_final_video.mp4.mp4
http://www.isro.gov.in/sites/default/files/videos/gsat_19_final_video.mp4.mp4 (http://www.isro.gov.in/sites/default/files/videos/gsat_19_final_video.mp4.mp4) (1:59)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 06.06.2017 20:33:51
NORAD зарегистрировал 2 объекта запуска
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71667)
 (https://forum.novosti-kosmonavtiki.ru/forum/file/71668)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 06.06.2017 20:45:36
По данным  n2yo

GSAT 19 - 42747 / 2017-031A

Эпоха UTC 2017-06-05 07:13:11, орбита 170.1 km × 34598.8 km × 21.5°, период 607.3 min

GSLV R/B - 42748 / 2017-031B

Эпоха UTC 2017-06-05 07:18:11, орбита 162.9 km × 34919.8 km × 21.5°, период 613.3 min
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Старый от 07.06.2017 04:12:03
ЦитироватьЧебурашка пишет:
Странно, что центральный блок такой короткий.
Его можно раза в два удлинить увеличив запас топлива.
А с тяговооружённостью проблем не будет?
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Старый от 07.06.2017 04:14:09
Практическое рождение новой ракеты. Нечастое событие. Индусов есть с чем поздравить.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Старый от 07.06.2017 04:33:35
Я правильно понимаю что стартовая масса как у Протона, водород на верхней ступени, пуск с 14-й параллели и всего 4 тонны на ГПО? Поздравить можно только с рождением ребёнка но не с его способностями.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: drzerg от 07.06.2017 05:33:00
там программу развития этой ракеты стоит посмотреть. то что летает всего лишь проходной вариант. далее заменят центральный блок на керосиновый и будет сразу 6т на гпо. по прежнему будут не самые самые но уже не на гептиле и скорее всего дешевле протона с теми же 700 стартовыми тонн. + 4 вида варианта твердотопливных ускорителей для разных нагрузок.  
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 08.06.2017 10:56:16
http://www.isro.gov.in/update/08-jun-2017/first-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried
ЦитироватьJun 08, 2017

The first orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 116 sec from 14:03 hr IST on June 06, 2017.
Orbit Determination results from this LAM firing are:

Apogee X perigee height was changed to 35938 km X 172.77 km.
 Inclination is 21.56 deg.
 Orbital period is 10 hr 33 min.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 08.06.2017 10:57:45
http://www.isro.gov.in/update/08-jun-2017/second-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried
ЦитироватьJun 08, 2017

The second orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 5538 sec from 15:44 hr IST on June 07, 2017.
Orbit Determination results from this LAM firing are:

Apogee X perigee height was changed to 35840 km X 10287 km.
 Inclination is 7.02 deg.
 Orbital period is 13 hr 58 min.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 09.06.2017 04:24:50
Цитировать (https://pbs.twimg.com/profile_images/866278093828247556/p9zmSlji_bigger.jpg) Rachana‏ @rachanareddym (https://twitter.com/rachanareddym) 7 ч. назад (https://twitter.com/rachanareddym/status/872884947819823106)

GSLV Mk III on the Launch Pad by WorldView-2 @DigitalGlobe (https://twitter.com/DigitalGlobe)
(https://img.novosti-kosmonavtiki.ru/162801.jpg)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 10.06.2017 17:05:31
http://www.isro.gov.in/update/10-jun-2017/third-orbit-raising-operation-of-gsat-19-satellite-has-been-successfully-carried
ЦитироватьJun 10, 2017

The third orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 3469 sec from 09:55 hr IST on June 09, 2017
Orbit Determination results from this LAM firing are:
    [/li]
  • apogee X perigee height was changed to 35875 km X 30208 km.
  • Inclination is 0.793 deg.
  • Orbital period is 21 hr 38 min
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 10.06.2017 17:08:57
http://www.isro.gov.in/update/10-jun-2017/fourth-and-final-orbit-raising-operation-of-gsat-19-satellite-has-been
ЦитироватьJun 10, 2017

The fourth and final orbit raising operation of GSAT-19 Satellite has been successfully carried out by LAM Engine firing for 488 sec from 07:59 hr IST on June 10, 2017
Orbit Determination results from this LAM firing are:
    [/li]
  • apogee X perigee height was changed to 35869 km X 35470 km.
  • Inclination is 0.101 deg.
  • Orbital period is 23 hr 50 min 10 sec
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 10.06.2017 17:11:35
http://www.isro.gov.in/update/10-jun-2017/south-and-north-solar-arrays-of-gsat-19-have-been-successfully-deployed-1615-hr
ЦитироватьJun 10, 2017

South and North solar arrays of GSAT-19 have been successfully deployed by 16:15 hr IST
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 11.06.2017 00:49:55
http://spaceflight101.com/gslv-mk3-d1/indias-gsat-19-reaches-geostationary-orbit-after-off-target-injection/
ЦитироватьIndia's GSAT-19 Reaches Geostationary Orbit after Off-Target Injection

 June 10, 2017 (http://spaceflight101.com/gslv-mk3-d1/indias-gsat-19-reaches-geostationary-orbit-after-off-target-injection/)
Спойлер
(https://img.novosti-kosmonavtiki.ru/152857.jpg) (http://spaceflight101.com/gslv-mk3-d1/wp-content/uploads/sites/161/2017/06/gslvmk-iii061.jpg)
Photo: Indian Space Research Organization
[свернуть]
India's GSAT-19 satellite reached a near-Geostationary Orbit on Saturday after a re-planned orbit-raising campaign that was necessitated by a slightly off-target delivery of the high-throughput communications satellite by the new GSLV Mk. III launch vehicle.

GSAT-19 became the heaviest satellite launched from Indian soil on Monday when taking flight atop the GSLV Mk. III, (http://spaceflight101.com/gslv-mk3-d1/gslv-mk-iii-first-orbital-launch-success/) making its first all-up orbital test flight to become the newest and most-powerful member in India's launcher fleet.
Спойлер
GSLV Mk. III blasted off from the Second Launch Pad at the Satish Dhawan Space Center at 11:58 UTC on Monday under the power of its two large Solid Rocket Boosters, outputting a maximum liftoff thrust of 1,050 metric-ton force. Monday's liftoff marked a major achievement for the Indian Space Research Organization after 16 years of work on the Geosynchronous Satellite Launch Vehicle Mark III that is ultimately envisioned to handle heavy Geotransfer missions supporting all of India's satellite programs that currently rely on foreign launchers.

Blazing away from India's East Coast toward the south East, GSLV Mk. III fired up its two-engine L110 core stage one minute and 55 seconds into the flight followed 26 seconds later by the separation of the spent boosters. The core stage and its twin Vikas 2 engines delivered 156 metric ton-force of thrust over a burn of three minutes and 23 seconds, in the process accelerating the stack to 4.0 kilometers per second (relative velocity).

(https://img.novosti-kosmonavtiki.ru/152854.jpg) (http://spaceflight101.com/gslv-mk3-d1/wp-content/uploads/sites/161/2017/06/10-6c25cryogenicstageatstagepreparationfacility.jpg)
C25 Cryo Stage – Image: ISRO

This set up for the moment of truth, coming when the C25 Cryogenic Upper Stage fired up its 200-Kilonewton CE-20 engine, India's most-powerful cryogenic rocket engine developed to date. C25 and its engine in particular had been the primary reason for GSLV Mk. III falling seven years behind its original project schedule and all eyes were on the screens at Mission Control displaying the launcher's trajectory as the third assumed control of propulsive flight.

Per the original flight plan, the C25 cryo stage was planned to fire for ten minutes and 43 seconds to accelerate the stack by 5.8 Kilometers per second to reach the planned injection speed of 9.8 km/s. However, Launch Control displays showed a not insignificant overperformance, meaning the stage was accelerating faster than predicted through mission simulations.

This in itself is not uncommon especially for a completely new rocket stage for which only theoretical performance models exit.

(https://img.novosti-kosmonavtiki.ru/152858.jpg) (http://spaceflight101.com/gslv-mk3-d1/wp-content/uploads/sites/161/2017/06/mk3-d1-71.jpg)
Performance Graph for the D1 Mission shows a slight overperformance of the cryogenic stage – Image: DD News

However, it requires a guidance system capable of detecting the overperformance and adjusting the flight path to reach the proper orbit and shut the engine down early once the desired injection speed/orbit are reached.

GSLV Mk. III (http://spaceflight101.com/spacerockets/gslv-mk-iii/) appeared to do just that, ending the CE-20 burn after ten minutes and 24.8 seconds – 18 seconds earlier than was planned per the pre-flight prediction. The satellite separated as expected 15 seconds after the end of powered flight and GSLV Mk. III's first orbital mission was declared a full success.

Initial tracking elements provided by the Joint Space Operations Center showed GSAT-19 in an orbit of 158 by 34,579 Kilometers, inclined 21.55°. This orbit was over 1,000 Kilometers short on apogee compared to the planned injection orbit of 170 by 35,975 Kilometers, 21.5°. In terms of change in velocity, GSAT-19 needed an additional 15m/s to make up for the shortfall – not particularly dramatic, but enough to change the planned orbit-raising scheme that called for three maneuvers to be carried out around apogee to circularize the orbit and reduce the orbital inclination to zero in order to put the craft into a drift orbit near GEO.

(https://img.novosti-kosmonavtiki.ru/152856.jpg) (http://spaceflight101.com/gslv-mk3-d1/wp-content/uploads/sites/161/2017/06/gsat-19-3.jpg)
GSAT-19 Planned Post Launch Sequence – Image: ISRO

This plan was changed and a supplementary maneuver was ins erted to make up for the off-target injection. GSAT-19 fired up its Liquid Apogee Motor at 8:33 UTC on Tuesday when passing the low point of its orbit in order to raise the apogee to what was expected at orbital insertion. The 116-second firing of the 440-Newton LAM changed the vehicle's velocity by ~16m/s and placed GSAT-19 into an orbit of 173 x 35,938 Kilometers.

From there, the satellite continued as planned with a three-burn GEO transfer. LAM fired up again at 10:14 UTC on June 7 for a lengthy burn of 5538 seconds that changed the craft's velocity by around 900m/s and put it into an orbit of 10,287 by 35,840 Kilometers at an inclination of 7.02 degrees. The next burn was 3469 seconds in duration and began at 4:25 UTC on June 9, providing a delta-v of just over 700 meters per second and placing the satellite in a 30,208 by 35,875-Kilometer orbit, inclined 0.79 degrees.

The third and final orbit-raising maneuver occurred at 2:29 UTC on Saturday, June 10 and lasted 488 seconds for a delta-v of around 110 meters per second, boosting the satellite into a Geostationary Drift Orbit of 35,470 x 35,869 Kilometers, inclined 0.1 degrees. ISRO also confirmed on Saturday that GSAT-19 successfully deployed both of its solar arrays at 10:45 UTC followed by the deployment of the two antenna reflectors and the acquisition of three-axis control by 14:12 UTC.

GSAT-19 is now se t for a period of orbital fine-tuning to enable the satellite to become fully stationary at its initial orbital location.

(https://img.novosti-kosmonavtiki.ru/152855.jpg) (https://img.novosti-kosmonavtiki.ru/152855.jpg)
Photo: ISRO

In terms of propellant reserves for the operational mission of the craft, the supplementary maneuver needed due to the slightly off-target injection will have negligible or no consequences at all. Conservative calculations show GSAT-19 consumed around 1,360 Kilograms of propellant firing the LAM engine, plus a smaller quantity spent for attitude control, leaving at least 300kg of propellant onboard the satellite which will be sufficient for almost 12 years of stationkeeping maneuvers. GSAT-19 has been designed for a nominal service life of 10 years.

Nevertheless, the slightly off-target delivery means work for ISRO's engineers, now tasked with tweaking GSLV's guidance algorithm – taking into account actual performance numbers of C25 for future missions and refining the vehicle's response to changes in performance in flight to ensure future missions will accomplish more accurate injections.

ISRO will eventually switch all of India's satellite launches to its own launchers and also plans to offer rides on both GSLV versions on the commercial market once the vehicles have fully proven themselves. For the Mark III variant, the next mission won't come until 2018 with a tentative launch date in January with the GSAT-20 satellite that will debut a new satellite platform and put GSLV's enhanced performance to the test.

GSAT-19 is now ready to head into testing before beginning operational services with a high-throughput Ka/Ku-Band payload to support data-intensive telecommunications with a total capacity of 4Gbps. The satellite also hosts a number of advanced satellite technologies like Indian-built Li-Ion batteries, miniaturized heat pipe technology for more efficient thermal regulation, fiber-optic gyros for attitude determination, Micro Electro-Mechanical (MEMS) accelerometers, and a Ku-Band telemetry/telecommand transponder.

>> GSAT-19 Satellite Overview (http://spaceflight101.com/gslv-mk3-d1/gsat-19/)
[свернуть]
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 11.06.2017 09:07:38
http://www.isro.gov.in/update/10-jun-2017/west-and-east-reflectors-of-gsat-19-have-been-successfully-deployed-1847-hr-ist
ЦитироватьJun 10, 2017

West and East reflectors of GSAT-19 have been successfully deployed by 18:47 hr IST.
Three axis stabilisation of GSAT-19 has been achieved by 19:42 hr IST
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 13.06.2017 17:28:34
http://www.isro.gov.in/update/13-jun-2017/gslv-mk-iii-d1-gsat-19-message-president
ЦитироватьJun 13, 2017

GSLV Mk III-D1/GSAT-19 Message from President
(http://210.210.21.137/sites/default/files/pranab_mukherjee-gslv-mkiii.jpg)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 15.06.2017 13:37:58
НОРАД подтвердило данные ISRO (см пост #101 (http://novosti-kosmonavtiki.ru/forum/messages/forum12/topic15695/message1656028/#message1656028))

GSAT 19

1 42747U 17031A 17165.82347976 -.00000234 +00000-0 +00000-0 0 9992
2 42747 000.1008 282.6101 0052431 272.8888 086.6356 01.00638976000153

Эпоха UTC 2017-06-14 19:45:48, орбита 35470.6 km × 35911.7 km × 0.1°, период 1430.9 min

Текущее положение: 0.06°S 82.75°E
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 26.06.2017 20:56:45
Сабж практически скруглил орбиту

GSAT 19
 
1 42747U 17031A   17177.01712205 -.00000178 +00000-0 +00000-0 0  9994
2 42747 000.0557 278.6454 0003012 162.9925 281.3532 01.00270586000271
 
Эпоха UTC 2017-06-26 00:24:39, орбита 35781.4 km × 35806.8 km × 0.06°, период 1436.1 min
 
Текущее положение: 0.03°S 82.51°E
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Брабонт от 14.01.2018 16:17:38
3 января начали перегонять куда-то к западу (INSAT 55E? - под рукой нет НК 08'2017)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Брабонт от 15.01.2018 09:24:42
Вообще, согласно НК, рабочая точка у него была именно над 74 в.д. И перевод двухимпульсный... Посмотрим, что будет дальше, но никаких официальных сообщений об изменении статуса аппарата я не нашёл.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Брабонт от 07.02.2018 20:32:12
Аппарат продолжает дрейфовать к востоку и уже прошёл точку 43 в.д. Неужели всё-таки увод практически нового аппарата?
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: che wi от 13.02.2018 18:42:50
КА прибыл в свою рабочую точку стояния 48E.
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 13.02.2018 20:03:20
Цитироватьche wi пишет:
КА прибыл в свою рабочую точку стояния 48E.
(https://forum.novosti-kosmonavtiki.ru/forum/file/80194)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: tnt22 от 13.02.2018 20:10:56
ЦитироватьВиктор Воропаев пишет:
Вообще, согласно НК, рабочая точка у него была именно над 74 в.д.
https://www.isac.gov.in/communication/html/gsat-19.jsp
Цитировать
Orbit / locationGeostationary orbit / 48°
 East longitude ( first few months at 82.5 deg location)
Название: GSAT-19 – GSLV-D1 (Mk-III / LVM3) – Шрихарикота – 05.06.2017, 11:58 UTC
Отправлено: Брабонт от 14.02.2018 12:54:52
У меня выдаёт "HTTP Status 404", но раз воткнулся в инсатовский слот 48E, значит, всё в порядке.