GSAT-9 (South Asian Satellite) – GSLV-F09 (Mk-II) – Шрихарикота – 05.05.2017 11:00 UTC

Автор che wi, 30.01.2017 11:49:39

« назад - далее »

0 Пользователи и 1 гость просматривают эту тему.

tnt22


tnt22



tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 2 мин. назад

Under ten minutes to launch. #GSLV transfer to internal power is coming up ahead of tanking close-out and tank pressurization.

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 47 сек. назад

Under five minutes to go, Indian media also clueless as to whether today's #GSLV launch occurs in secret.

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 2 мин. назад

Three minutes to the opening of today's launch window. #GSLV should be fully-fueled, on internal power and pressurizing for liftoff.

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 1 мин. назад

At T-4.8sec, the four strap-on boosters will ignite. Vikas 2 engines will be monitored before S139 ignition at T-0. #GSLV







tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 3 мин. назад

LIFTOFF! India's #GSLV Rocket thunders off from Sriharikota to lift the GSAT-9 communications satellite to orbit.

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 13 сек. назад

Visually, all appeared nominally through the core stage burn & L40 operation. Orbital insertion around 11:44 UTC. #GSLV




tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 1 мин. назад

The Cryogenic Upper Stage should be in charge of powered flight at this time, firing 12 min to boost GSAT-9 into an elliptical orbit. #GSLV

tnt22

Цитировать Spaceflight101 LIVE‏ @S101_Live 45 сек. назад

Three minutes of powered flight should be remaining for the #GSLV, accelerating to an injection speed around 9.7km/s.